![](https://avicegroup.com/wp-content/uploads/2023/11/foto,1,59339,600.jpg)
Closures of the Heinenoord tunnel in the Netherlands
In December the Heinenoord tunnel on the A29 will be closed for 2 weekends and 2 nights. The renovation work will be continued next year.
Closures of the tunnel in the direction of Bergen op Zoom
• from 10:00 PM on Friday, December 1, until 05:00 AM on Monday, December 4;
• from 00:00 to to 05:00 AM on Thursday, December 7;
Diversion routes for traffic towards Bergen op Zoom (north to south)
• transit traffic will be diverted via A15, A16 and A17.
Closures of the tunnel in the direction of Rotterdam
• from 10:00 PM on Thursday, December 7, to 05:00 AM on Friday, December 8;
• from 10:00 PM on Friday, December 15, until 05:00 AM on Monday, December 18;
Diversion routes for traffic towards Rotterdam (from south to north)
• transit traffic will be diverted via A17, A16 and A15
During the closure of the Heinenoord tunnel, the Kil tunnel in the same direction can be used free of charge.
Diversion routes during the December closures of the Heinenoord tunnel ⬇
Latest Posts
Germany: complete closure of the A43 – diversion for through traffic
The closure is connected with the construction of a tunnel near the Herne intersection.The A43 motorway will be completely closed from 9 PM on Friday, July...
Germany to introduce temporary checks on the border with France
In connection with the Olympic Games, checks will be introduced on the German-French border from July 20 to September 30. This may slow down HGV traffic.In...
Romania and Bulgaria introduce a sudden HGV driving ban owing to a heat wave
The ban, which applies to vehicles, has been intorduced to protect the asphalt road surface.RomaniaOn July 15-16, from 11:00 AM to 7:00 PM vehicles with a...