
HGV restrictions in Catalonia
Owing to forecasts of significant increases in traffic volume on the 28th, 30th of October and 1st of November, an additional restriction will be introduced on some road and motorway sections for vehicles or combinations of vehicles with a maximum authorised mass of more than 7.5 tons, which are required to use the right lane and must not overtake other vehicles and drive faster than 80 km/h.
On Friday, October 28, between 3:00 PM and 9:00 PM, the restrictions will apply on the following road sections:
➖ the AP-7 motorway, between KP 126, exit 12B at La Roca del Vallés, Granollers and the junction with the C-60 in La Roca del Vallés, and KP 172, exit 25 at Martorell and the junction with the A-2 in the Martorell commune;
➖ the AP-7 motorway in the territory of Terres de l’Ebre, where there are only two lanes, between KP 257, exit 35 at Vila-seca, Salou, Reus S. and Port Aventura, in the municipality of Vila-seca, and KP 344,8 the border between Tarragona and Castellón, in the municipality of Ulldecona.
On Sunday, October 28 and November 1, between 3:00 PM and 10:00 PM, the restrictions will apply on the following road sections:
➖ the northbound AP-7 motorway, between KP 111.1, exit 11 at Sant Celoni and Montseny in the commune of Sant Celoni, and KP 133.8, exit 13 at Granollers, Montornès del Vallès and Vilanova del Vallés, in the municipality of Montornès del Vallès;
➖ the southbound AP-7 motorway, between KP 158, where the B-30 joins the AP-7, in the commune of de Sant Cugat del Vallés, and KP 213 in the commune of Banyeres del Penedès, the fork junction AP-7 / AP-2;
➖ the B-23, between KP 8, exit 8 at Sant Feliu de Llobregat and Molins de Rei Sud, in the municipality of Sant Feliu de Llobregat, and KP 15.5 on the B 23, at the junction with the AP-7, in the municipality of Castellbisbal.
Latest Posts
Poland and the Czech Republic are introducing temporary checks on the border with Slovakia
The decisions were announced by Mariusz Kamiński, the Minister of the Interior and Administration, and the Czech Prime Minister, Petr Fiala, during today's...
Germany: the A2 towards Magdeburg closed until Saturday
Cleanup operations are still underway after the accident that happened on Tuesday afternoon on the A2 motorway in the direction of Hannover, between the...
Total closure of the Mont Blanc Tunnel for 9 consecutive weeks
In order to enable technical maintenance work, the Mont Blanc Tunnel will be totally closed for a period of 9 consecutive weeks, starting at 8:00 AM on...