Tunel Fréjus – prace konserwacyjne od 1 lipca do 1 sierpnia 2024 r.
Całkowite zamknięcie tunelu Fréjus od poniedziałku 8 lipca od 22:00 do wtorku 9 lipca do 6:00.
Szczegółowy kalendarz przerw i ruchu naprzemiennego w tunelu Fréjus od 1 lipca do 1 sierpnia 2024 r. dostępny jest TUTAJ.
Latest Posts
The Reschen Pass closed from October 8 to December 20
The Reschen Pass, connecting South Tyrol in Italy with Tyrol in Austria, will be closed from October 8 to December 20. During this period, traffic will be...
The Reschen Pass closed from October 8 to December 20
France: an exemption from the Sunday driving ban in northern France for certain types of transports
In response to a bird flu epidemic, which has broken out in northern France, the authorities have introduced an exemption from the driving ban on Sundays...
Germany: A1 closed for three weekends
In the coming weeks, drivers travelling through North Rhine-Westphalia will face major disruptions. The A1 motorway in the Unna area will be closed for...