
UK – M20 closure Junction 9 to 11
To reach Dover and Eurotunnel, drivers will have to follow a signed diversion route.
The M20 coast bound carriageway will be closed overnight between junctions 9—11 from Tuesday 26 June to Saturday 30 June from 8pm—6am to undertake surfacing works.
All freight traffic travelling to Dover and Eurotunnel on these dates are to use the A2/M2 or follow the signed diversion route from junction 9 along the A28, A2 and A20.
The M20 London bound will be closed overnight between junctions 11 – 9 from Tuesday 3 July to Friday 6 July. All freight traffic travelling from Dover on these dates are to use the A2/M2 or follow the signed diversion route from the Thanington junction for the A28 to re-join the M20 at junction 9.
London bound freight traffic from Eurotunnel will be diverted via the M20, A20, A2 and A28 to re-join the M20 at junction 9.
Latest Posts
Poland: an HGV driving ban in Pruszcz Gdański
After months of talks and analyses, the Municipal Office of Pruszcz Gdański has finally decided that vehicle with a GVM over 20 tonnes will be prohibited...
Hungary: renovation of the M1
MKIF (Magyar Koncessziós Infrastruktúra Fejlesztő Zrt.), the Hungarian company responsible for the country’s road infrastructure, has published a list of...
Hungary: renovation of the M1
Disaster on Norway’s E6: Detour Extends Route by Over 300 km
A major rockslide has completely blocked both directions of the E6 highway in Rosten (Gudbrandsdalen region), one of Norway’s most vital transport arteries....