
Poland: Several weeks of disruptions, speed limits and a closed service area on the A1
The measures are connected with renovation works scheduled to last about 8 weeks, depending on weather conditions.
Since Monday, September 11, traffic along a 7-kilometer section of the A1 motorway (km 2+200 to km 9+250) has been directed to the carriageway in the direction of Łódź. There are two lanes for traffic in the direction of Gdańsk and one lane for vehicles going in the direction of Łódź. The motorway service area Kleszczewko in the direction of Łódź has been closed to lorries and buses. The speed limit on this section of the A1 is 80 km/h. Drivers are advised to be extra careful and follow temporary traffic management signs.
Latest Posts
Austria przedłużyła kontrole graniczne z Czechami
Zgodnie z rozporządzeniem Federalnego Ministra Spraw Wewnętrznych, kontrole graniczne na wspomnianej granicy mają potrwać do 16 grudnia 2023 roku włącznie.6...
Austria przedłużyła kontrole graniczne z Czechami
Austria prolongs controls at the border with Czechia
By virtue of a regulation issued by the Austrian Minister of the Interior, checks at the Austrian-Czech border will continue until December 16, 2023.The...
Austria prolongs controls at the border with Czechia
No more overtaking on the D1 in Czechia
On Saturday, November 11, an overtaking ban for lorries with a MAM over 3.5 t was introduced in the Czech Republic, which also applies to the D1...