Avice Group

  • Home
  • About
  • Work
  • News
  • Contacts
  • English
    • Polski (Polish)
    • Русский (Russian)
    • Deutsch (German)

Avice Group

  • Home
  • About
  • Work
  • News
  • Contacts
  • English
    • Polski (Polish)
    • Русский (Russian)
    • Deutsch (German)
  • Home
  • About
  • Work
  • News
  • Contacts
  • English
    • Polski (Polish)
    • Русский (Russian)
    • Deutsch (German)
by
UncategorizedSeptember 15, 20250 comments

Nighttime closures of the Van Brienenoord Bridge on the A16 in Rotterdam – detours and disruptions

In mid-September, drivers will face major disruptions on the A16 motorway in Rotterdam. Due to maintenance works, the Van Brienenoord Bridge will be closed twice during nighttime hours.

Bridge closure dates and times:

▪️ Monday, September 15, from 10:00 p.m. to Tuesday, September 16, at 5:00 a.m.;
▪️ Tuesday, September 16, from 10:00 p.m. to Wednesday, September 17, at 5:00 a.m.

During these periods, the Van Brienenoord Bridge crossing will be completely unavailable for motor vehicle traffic in both directions. The closure covers both the main and parallel carriageways of the A16 from the Ridderster junction up to the bridge itself.

Detours for transit traffic

Transit traffic will be redirected via the Rotterdam ring road (Beneluxtunnel), using the A20, A4, and A15. Some on-ramps and off-ramps will already be closed from 9:00 p.m. to allow maintenance crews to work without disruption. This measure ensures that all traffic is cleared from the section before the start of the works and the bridge closure. Detours will be clearly marked with yellow information signs and digital display boards placed above and alongside the roadway.

Direction The Hague → Ridderkerk:

➡️ Exit 27 – open, entrance 27 – open,
➡️ Exit 26 – open, entrance 26 – closed from 9:00 p.m.,
➡️ Exit 25 – open, entrance 25 – closed from 9:00 p.m.,
➡️ Exit 24 – closed from 10:00 p.m., entrance 24 – closed from 1:00 a.m.

Direction Ridderkerk → The Hague:

➡️ Exit 27 – open, entrance 27 – open,
➡️ Exit 26 – open, entrance 26 – open,
➡️ Exit 25 – closed from 10:00 p.m., entrance 25 – open,
➡️ Exit 24 – closed from 10:00 p.m., entrance 24 – closed from 9:00 p.m.

Bulgaria: August Restrictions for Trucks on the Trakia MotorwayPrev
September 15 with exemption from truck bans in SlovakiaNext

Latest Posts

by

Easter truck driving bans in Poland. One provision makes the difference

During the Easter period in Poland, additional traffic bans apply to trucks with a gross vehicle weight exceeding 12 tonnes. The restrictions will cover...

Easter truck driving bans in Poland. One provision makes the difference

UncategorizedApril 20, 2026
by

Romania will shut down the toll system. Drivers will not be able to buy a vignette

CNAIR has announced a planned technical interruption that will affect the ability to purchase vignettes and pay road tolls in Romania.On Wednesday, April 8,...

Romania will shut down the toll system. Drivers will not be able to buy a vignette

UncategorizedApril 20, 2026
by

Major disruptions ahead in Germany – A2 motorway closed, A4 with night closures

April brings significant disruptions on German motorways. According to Die Autobahn GmbH des Bundes, the A2 motorway in Dortmund will be completely closed...

Major disruptions ahead in Germany – A2 motorway closed, A4 with night closures

UncategorizedApril 20, 2026

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Avice Group

Avice Group – is an international company. 365 days a year we are engaged in cargo transportation. Delivering cargo even to the farthest corners of Europe.

Appricotsoft.com Development

Head Office

Poland

30-415 Krakow ul. Bonarka 21, PL 

email: [email protected] 

Get Contacts