Avice Group

  • Home
  • About
  • Work
  • News
  • Contacts
  • English
    • Polski (Polish)
    • Русский (Russian)
    • Deutsch (German)

Avice Group

  • Home
  • About
  • Work
  • News
  • Contacts
  • English
    • Polski (Polish)
    • Русский (Russian)
    • Deutsch (German)
  • Home
  • About
  • Work
  • News
  • Contacts
  • English
    • Polski (Polish)
    • Русский (Russian)
    • Deutsch (German)
by
UncategorizedFebruary 16, 20230 comments

HGV restrictions in Catalonia in February and March

Owing to forecasts of significant increases in traffic volume on the 17th and 24th of February and 3rd, 10th, 17th and 24th of March, an additional restriction will be introduced on some road and motorway sections for vehicles or combinations of vehicles with a maximum authorised mass of more than 7.5 tons, which are required to use the right lane and must not overtake other vehicles and drive faster than 80 km/h.

On Friday, on the 17th and 24th of February and 3rd, 10th, 17th and 24th of March between 3:00 PM and 9:00 PM, the restrictions will apply on the following road sections:

➖ the AP-7 motorway, between KP 126, exit 12B at La Roca del Vallés, Granollers and the junction with the C-60 in La Roca del Vallés, and KP 172, exit 25 at Martorell and the junction with the A-2 in the Martorell commune;
➖ the AP-7 motorway in the territory of Terres de l’Ebre, where there are only two lanes, between KP 257, exit 35 at Vila-seca, Salou, Reus S. and Port Aventura, in the municipality of Vila-seca, and KP 344,8 the border between Tarragona and Castellón, in the municipality of Ulldecona.

Malhowice-Niżankowice border crossing: rules for the clearance of empty lorriesPrev
Changes in Spanish HGV restrictionsNext

Latest Posts

by

Norway relaxes regulations for truck drivers after landslide on E6 route

Following a landslide in Levanger, Norway, which blocked a key section of the E6 transport route, authorities have introduced extraordinary measures for...

Norway relaxes regulations for truck drivers after landslide on E6 route

UncategorizedOctober 11, 2025
by

Austria: Night-time closures of the Arlberg Tunnel from 22 September this year

The Arlberg Tunnel on Austria’s S16 road will be completely closed due to maintenance works from Monday, 22 September to Friday, 26 September 2025, each...

Austria: Night-time closures of the Arlberg Tunnel from 22 September this year

UncategorizedOctober 11, 2025
by

Belgium: Night closures of the E25/E40 connection at the Burenville interchange

Drivers in Belgium face further disruptions. Due to renovation works on the bridge at interchange no. 33 Burenville, night closures of the E25/E40...

Belgium: Night closures of the E25/E40 connection at the Burenville interchange

UncategorizedOctober 11, 2025

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Avice Group

Avice Group – is an international company. 365 days a year we are engaged in cargo transportation. Delivering cargo even to the farthest corners of Europe.

Appricotsoft.com Development

Head Office

Poland

30-415 Krakow ul. Bonarka 21, PL 

email: [email protected] 

Get Contacts