
Germany: A46 in Düsseldorf completely closed from Friday
The A46 motorway will be completely closed in both directions from August 15, 2025 at 9:00 p.m. until August 18, 2025 at 5:00 a.m.
Due to a scheduled inspection of the load-bearing cables, the Fleher Bridge (a bridge over the Rhine separating Düsseldorf and Neuss) will be entirely closed between the Düsseldorf-Bilk and Neuss-Uedesheim interchanges. A wide detour route has been set up via the Leverkusen and Cologne-North (Köln-Nord) interchanges. The works were originally scheduled for August 1–4 but had to be postponed due to weather conditions. The detours are signposted.
Vollsperrung, A 46, beide Fahrtrichtungen, vom 15.08.2025, 21:00 Uhr bis 18.08.2025, 05:00 Uhr
Für die regelmäßige…
Latest Posts
Easter truck driving bans in Poland. One provision makes the difference
During the Easter period in Poland, additional traffic bans apply to trucks with a gross vehicle weight exceeding 12 tonnes. The restrictions will cover...
Romania will shut down the toll system. Drivers will not be able to buy a vignette
CNAIR has announced a planned technical interruption that will affect the ability to purchase vignettes and pay road tolls in Romania.On Wednesday, April 8,...
Major disruptions ahead in Germany – A2 motorway closed, A4 with night closures
April brings significant disruptions on German motorways. According to Die Autobahn GmbH des Bundes, the A2 motorway in Dortmund will be completely closed...