
Double Closure of the A12 in the Netherlands: Traffic Jams and Detours to Paralyze Transport
The Dutch A12 motorway, one of the key routes for international transport, will be completely closed twice in 2025. Each closure will last for 9 consecutive days and nights, with the affected section stretching from Veenendaal to Utrecht (approximately 30 km) – one of the most frequently used corridors by freight carriers transiting through the Netherlands.
Rijkswaterstaat – the Dutch road authority – has announced a major resurfacing project. The old asphalt will be completely removed and replaced with new pavement using so-called “silent asphalt” technology, aimed at reducing noise levels in the surrounding areas. Dutch authorities are already warning of severe traffic congestion and delays that may extend travel times by more than an hour.
A12 Closure Dates
❌ May 9 (Friday), 8:00 PM – May 19 (Monday), 5:00 AM
❌ August 22 (Friday), 8:00 PM – September 1 (Monday), 5:00 AM
Plans for the closure of the opposite direction (Utrecht → Veenendaal) are still under development, but similar disruptions can be expected along that stretch as well.
Latest Posts
Easter truck driving bans in Poland. One provision makes the difference
During the Easter period in Poland, additional traffic bans apply to trucks with a gross vehicle weight exceeding 12 tonnes. The restrictions will cover...
Romania will shut down the toll system. Drivers will not be able to buy a vignette
CNAIR has announced a planned technical interruption that will affect the ability to purchase vignettes and pay road tolls in Romania.On Wednesday, April 8,...
Major disruptions ahead in Germany – A2 motorway closed, A4 with night closures
April brings significant disruptions on German motorways. According to Die Autobahn GmbH des Bundes, the A2 motorway in Dortmund will be completely closed...