
Germany – A8 closure at the weekend
Between 16 and 19 November drivers are going to face serious inconveniences as a result of another closure of the A8 in the Enz river valley.
The Regional Council of Karlsruhe and the German Railways have commissioned works to replace the existing railway bridge over the motorway with a new structure in connection with the widening of the A8 to 6 lanes around the junction Pforzheim-Ost. Works, which were commenced in March this years, are due to be completed in spring next year.
In order to dismantle the existing bridge and position a new one, it is necessary to close the motorway section between the junctions Pforzheim-Nord and Pforzheim-Ost in both directions during two weekends.
Latest Posts
Belgium: night closures between E25 and E40 in Liège starting today. Disruptions for several nights
For the next few nights, an important connection between the E25 and E40 motorways in Liège will be closed. The disruptions will affect the A602 tunnel ring...
New vignette rates in Latvia. Trucks will pay more
New road toll rates for heavy transport are now in force in Latvia. The changes took effect on March 1 and apply to vehicles with a gross vehicle weight...
France: ELO mandatory for trucks travelling to the United Kingdom from April
From April 20, 2026, France will introduce a mandatory ELO system for trucks crossing the border with the United Kingdom. A single barcode will contain all...