
Catalonia: HGV restrictions on AP-7 on 21-23 April
These restrictions are motivated by forecasts of significant increases in traffic volume.
The restriction applies to vehicles with a maximum authorised mass of more than 7.5 tons, which are required to use the right lane and must not overtake other vehicles and drive faster than 80 km/h
On April 21, between 3:00 PM and 9:00 PM, the restrictions will apply on the following sections of the AP-7:
➖ between KP 172, exit 25 in Martorell and the junction with the A-2, in the municipality of Martorell, and KP 176.6, exit 26 in Gelida and Sant Llorenç d’Hortons, in the municipality of Gelida,
➖ between KP 126, exit 12B in La Roca del Vallès, Granollers and the junction with the C-60, in the municipality of La Roca del Vallés, and KP 176.6, exit 26 in Gelida and Sant Llorenç d’Hortons , in the municipality of Gelida,
On April 22, between 3:00 PM and 2:00 PM, the restrictions will apply on the following sections of the AP-7:
➖ between KP 172, exit 25 in Martorell and the junction with the A-2, in the municipality of Martorell, and KP 176.6, exit 26 in Gelida and Sant Llorenç d’Hortons, in the municipality of Gelida,
On April 23, between 3:00 PM and 10:00 PM, the restrictions will apply on the following sections of the AP-7:
➖ between KP 111.1, exit 11 Sant Celoni and Montseny, in the municipality of Sant Celoni, and KP 133.8, exit 13 in Granollers, Montornès del Vallès and Vilanova del Vallés, in the municipality of Montornés del Vallès Valles.
➖ between KP 176.6, exit 26 Gelida and Sant Llorenç d’Hortons, in the municipality of Gelida and KP 172, exit 25 in Martorell and the junction with the A-2, in the municipality of Martorell.
Latest Posts
Norway relaxes regulations for truck drivers after landslide on E6 route
Following a landslide in Levanger, Norway, which blocked a key section of the E6 transport route, authorities have introduced extraordinary measures for...
Austria: Night-time closures of the Arlberg Tunnel from 22 September this year
The Arlberg Tunnel on Austria’s S16 road will be completely closed due to maintenance works from Monday, 22 September to Friday, 26 September 2025, each...
Belgium: Night closures of the E25/E40 connection at the Burenville interchange
Drivers in Belgium face further disruptions. Due to renovation works on the bridge at interchange no. 33 Burenville, night closures of the E25/E40...