
Belgium: HGV traffic redirected to the main roads starting from November
From Monday, November 4, the local authorities of Steenokkerzeel, Kampenhout, Kortenberg and Herent introduce a route coordination scheme for HGV traffic (tonnage limitation, maximum permissible weight of 3.5 tons) at inter-municipal level.
GHV through traffic will have to use the main roads – Haachtsesteenweg (N21), Tervuursesteenweg (N227), Brusselsesteenweg (N2) and Leuvense-/Mechelsesteenweg (N26). This restriction only applies to freight vehicles in through traffic. Local freight traffic (e.g. deliveries) is permitted even if the GVW exceeds the limit of 3.5 tons.
Latest Posts
Traffic disruptions in the Fréjus Tunnel – schedule of closures and alternating traffic
Drivers travelling through the Fréjus Tunnel must prepare for temporary traffic disruptions. Owing to maintenance work, which started on February 3 and will...
Watch out for misleading satnav directions: the lorry checkpoint on the A13 in Austria is closed
Since 1 January 2025, one lane is open to traffic in each direction on the Lueg Bridge. As a result, the lorry checkpoint at Brenner-Nord in the northern...
Belgium: renovation of the Liefkenshoek Tunnel
Drivers travelling through Belgium must prepare for disruptions in the Liefkenshoek Tunnel related to regular maintenance and renovation work.As a result,...