
Germany: weighbridge on A44 and HGV ban on the Bergausen bridge
A weighbridge has just been installed on the Bergausen bridge on the A 44. The bridge will be closed to lorries over 3.5 tonnes coming from Dortmund until April.
The device features a light signal and a boom gate, which blocks access to lorries over 3.5 tonnes and with a width exceeding 2.1 metres. Such vehicles are then diverted to a special ramp. The weighbridge will be in operation until the end of April, when the bridge renovation work is expected to be over.
At the Kassel West junction HGV traffic is diverted through A49. Drivers who fail to respect the ban face fines of up to 500 euro.
The bridge on the Fulda river in Berghausen near Kassel can no longer withstand the growing volume of traffic and its southern part from the side of the Kassel-Süd junction has to be reinforced.
Latest Posts
Slovakia tightens border controls – longer queues for HGVs
In an effort to limit the spread of foot-and-mouth disease, Slovakia, Austria and Hungary have introduced temporary sanitary border checks, which are...
Hungary: closure of the Pentele Bridge
On Friday, April 11 at 5:00 p.m., the Pentele Bridge on the M8 route, which connects Dunaújváros and Dunavecse, will be completely closed. The work will...
Slovakia: a derogation from the HGV driving ban on April 18
In connection with the upcoming Easter holidays, the Presidium of the Police of the Slovak Republic has announced a special derogation from of the HGV...