
A1: complete weekend closure between Ascheberg and Münster-Hiltrup
The A1 will be closed in order to install prefabricated superstructure components of a motorway bridge in the Münsterland.
The installation of the overpass along Amelsbürener Straße (K39) is part of the investment project of widening the section of the A1 between Münster-Hiltrup and Ascheberg to six lanes. The closure begins today at 10 PM and will last until 5 AM on Monday (March 20).
Diversion routes
Long-distance traffic from the north is diverted from the Lotte motorway intersection via the A30, A33 and A2 to the Kamener intersection. Long-distance traffic from the south is diverted along the same route in the opposite direction. Another diversion for traffic from the Münsterland starts from Münster-Süd via the A43 and the A2 to the Kamener intersection. The same route is available for traffic in the opposite direction. Local diversions towards the south start from Münster-Hiltrup via the U26a and towards the north from Ascheberg via the U83. The new Amelsbürener Strasse overpass is expected to be reopened by the end of May.
Latest Posts
Spain: Night-time closures of the A-1
The expansion of access roads connecting the AP-1 motorway with the A-1 motorway, work is underway at the Armiñón junction on the fork between the A-1...
From midnight, a strike in Calais and a complete halt of operations at the port.
Trade unions at the French port of Calais have announced a "dead port" day for Thursday, 27 February. The protest, organized by the CGT union, is set to...
Drivers work schedule – which one really pays off? The answer is not obvious
Every professional driver knows that the work schedule is a key aspect of everyday functioning. In addition to having an impact on the earnings, it also...