Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertAugust 29, 20230 comments

A 7 tunnel construction in Altona: traffic difficulties

The traffic will be reorganised over several consecutive nights, including lane reductions and a night-time closure of the northbound carriageway between the junction HH-Othmarschen (29) and junction HH-Volkspark (27).

From Thursday, July 27, until the first quarter of 2024 at the HH-Othmarschen (29) junction
• no left turn for traffic from the direction of Wedel on the A7
– drivers can use the northbound slip lane at the HHBahrenfeld (28) junction.

From 10:00 PM on Saturday, July 29, to 9:00 AM on Sunday, July 30,
• nighttime closure of the northbound/Flensburg carriageway
• from 9:00 PM all junctions between HH-Othmarschen (29) and HH-Volkspark (27) will be closed.
Since no adequate diversion exists at HH-Othmarschen (29), traffic has to be diverted over longer routes!

The following diversions are available:
A wide diversion from the Maschener Kreuz (36) via the A 1, A 21 and B 205 is available for northbound transit traffic.
The official city diversion in the direction of Flensburg starts from the HH-Heimfeld junction (32) via the obligatory diversion U7 via the B 73 and B 75 to the Elbe bridges, further on the B 4 to get to the individual districts or further to the AS HH-Volkspark (27) or AS HH-Stellingen (26) to get back on the A7.

Oversize and abnormal transports:
A waiting zone will be set up on the A7 north of the Elbe tunnel at the HH-Othmarschen (29) junction for vehicles carrying oversize and abnormal loads that have already been approved. Depending on the type of approval, the intention of driving through the Elbe tunnel should be reported as usual by telephone one hour in advance, upon which vehicles can enter the waiting zone north of the Elbe tunnel on the A7. From there, vehicles will be guided through the closed-off section on request!

Ein Lkw-Verbot an der Grenze zwischen Österreich und LiechtensteinPrev
Belgium: closure of the Kennedy Tunnel in AntwerpNext

Latest Posts

by

Czechia and Austria tighten border controls – new rules for lorries

Today, April 4, marks the entry into force of of new, stricter rules for lorries crossing the border with Slovakia. Additional restrictions have also been...

Czechia and Austria tighten border controls – new rules for lorries

UnkategorisiertMai 7, 2025
by

Hungary: renovation of the M1

MKIF (Magyar Koncessziós Infrastruktúra Fejlesztő Zrt.), the Hungarian company responsible for the country’s road infrastructure, has published a list of...

Hungary: renovation of the M1

UnkategorisiertMai 3, 2025
by

Disaster on Norway’s E6: Detour Extends Route by Over 300 km

A major rockslide has completely blocked both directions of the E6 highway in Rosten (Gudbrandsdalen region), one of Norway’s most vital transport arteries....

Disaster on Norway’s E6: Detour Extends Route by Over 300 km

UnkategorisiertMai 3, 2025

Leave a Reply Antworten abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten