Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertMai 6, 20220 comments

How to avoid fines for the unlawful use of Hungarian roads?

Although the HU-GO distance-based toll system has been in operation since 2013, many transport companies still pay high fines for the unlawful use of Hungarian roads.

Since November 2017, after a revision of the penalty rules, the amount of administrative fine depends on the duration of unauthorised use and can range from moderate, through normal to high.
The toll is obligatory for all vehicles with a maximum total permissible weight over 3.5 tons and its rate is determined depending on the type of road (motorway, expressway or main road), vehicle category and its ecological classification. The toll is collected on a total of 6,500 km of roads, which cover nearly all major routes used for road haulage.

Ist Caen das neue Calais?Prev
Österreich erweitert GrenzkontrollenNext

Latest Posts

by

Attention! Austria has announced new truck bans – effective from today

The Austrian Ministry of Innovation, Mobility and Infrastructure has published the 72nd regulation regarding additional driving bans for heavy goods...

Attention! Austria has announced new truck bans – effective from today

UnkategorisiertMai 23, 2025
by

Slovakia tightens border controls – longer queues for HGVs

In an effort to limit the spread of foot-and-mouth disease, Slovakia, Austria and Hungary have introduced temporary sanitary border checks, which are...

Slovakia tightens border controls – longer queues for HGVs

Unkategorisiert, UnkategorisiertMai 19, 2025
by

Hungary: closure of the Pentele Bridge

On Friday, April 11 at 5:00 p.m., the Pentele Bridge on the M8 route, which connects Dunaújváros and Dunavecse, will be completely closed. The work will...

Hungary: closure of the Pentele Bridge

Unkategorisiert, UnkategorisiertMai 19, 2025

Leave a Reply Antworten abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten