Avice Group

  • Home
  • About
  • Work
  • News
  • Contacts
  • English
    • Polski (Polish)
    • Русский (Russian)
    • Deutsch (German)

Avice Group

  • Home
  • About
  • Work
  • News
  • Contacts
  • English
    • Polski (Polish)
    • Русский (Russian)
    • Deutsch (German)
  • Home
  • About
  • Work
  • News
  • Contacts
  • English
    • Polski (Polish)
    • Русский (Russian)
    • Deutsch (German)
by
UncategorizedAugust 29, 20230 comments

Netherlands – night closures of the Van Brienenoord bridge in Rotterdam

The Van Brienenoord bridge is 1,320 meters long and is one of the largest arch bridges in Europe. Every day, 230,000 vehicles pass through it.

The bridge will be completely closed during two nights: Monday, August 28, from 10:00 PM to 5:00 AM and on Tuesday, August 29, from 10:00 PM to 5:00 AM. The closure is necessary to conduct renovation work. Both the main and parallel lanes of the A16 from the Ridderster Junction to Van Brienenoord Bridge will be closed.

Diversion routes
❗ Transit traffic will be diverted through the Rotterdam ring road (Benelux tunnel) and the A20, A4 and A15 motorways. The diversion route is marked with yellow and numbered signs above and along the road.

An HGV ban on the border between Austria and LiechtensteinPrev
France: closure of A43, the Frejus Tunnel impassable for heavy goods transportNext

Latest Posts

by

Norway relaxes regulations for truck drivers after landslide on E6 route

Following a landslide in Levanger, Norway, which blocked a key section of the E6 transport route, authorities have introduced extraordinary measures for...

Norway relaxes regulations for truck drivers after landslide on E6 route

UncategorizedOctober 11, 2025
by

Austria: Night-time closures of the Arlberg Tunnel from 22 September this year

The Arlberg Tunnel on Austria’s S16 road will be completely closed due to maintenance works from Monday, 22 September to Friday, 26 September 2025, each...

Austria: Night-time closures of the Arlberg Tunnel from 22 September this year

UncategorizedOctober 11, 2025
by

Belgium: Night closures of the E25/E40 connection at the Burenville interchange

Drivers in Belgium face further disruptions. Due to renovation works on the bridge at interchange no. 33 Burenville, night closures of the E25/E40...

Belgium: Night closures of the E25/E40 connection at the Burenville interchange

UncategorizedOctober 11, 2025

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Avice Group

Avice Group – is an international company. 365 days a year we are engaged in cargo transportation. Delivering cargo even to the farthest corners of Europe.

Appricotsoft.com Development

Head Office

Poland

30-415 Krakow ul. Bonarka 21, PL 

email: [email protected] 

Get Contacts