Avice Group

  • Home
  • About
  • Work
  • News
  • Contacts
  • English
    • Polski (Polish)
    • Русский (Russian)
    • Deutsch (German)

Avice Group

  • Home
  • About
  • Work
  • News
  • Contacts
  • English
    • Polski (Polish)
    • Русский (Russian)
    • Deutsch (German)
  • Home
  • About
  • Work
  • News
  • Contacts
  • English
    • Polski (Polish)
    • Русский (Russian)
    • Deutsch (German)
by
UncategorizedSeptember 9, 20240 comments

Hungary: higher fines and newly tolled motorway sections

The regulation of the Ministry of Interior and Administration No. 25/2013 introduces new toll rates for vehicles with a GVW of over 3.5 tons and establishes newly tolled motorway sections starting from 1 September.

Newly tolled motorway sections:
➡️ a 16.5-kilometer section of the M6 motorway between Mohács and Lippó (between km 191 and km 208);
➡️ a 5.5-kilometer section of the M44 motorway between Szentkirály and Lakitelek (from km 24 to km 30,);
➡️ a 2-kilometer section of motorway 23 bypassing Bátonyterenye (from km 0 to km 2);
➡️ a 10-kilometer section of motorway 260 from Sajószentpéter to Berente;
➡️ a 22.5-kilometer section of motorway 451 between Szentes and Orosháza (from km 46 to km 77)
➡️ a 17-kilometer section of motorway 512 between the M6 motorway and Kalocsa (from km 0-17).

Changes in the amounts of fines for failure to pay toll that take effect from 16 August

According to the new scheme, fine amounts depend on vehicle categories, type of infringement and time interval. The amounts of fines that take effect from 16 August for different types of vehicles can be checked in the following table.

Salzburg: The HGV driving ban the B159 lifted until June 2025Prev
Traffic disruptions in Belgium, Germany, France and the RD66 between France and SpainNext

Latest Posts

by

Cancelled sailings to Sweden – Unity Line switches to truck check-in without reservations

Unity Line has announced further cancellations of scheduled ferry sailings between Świnoujście and ports in Sweden (Trelleborg, Ystad) due to difficult...

Cancelled sailings to Sweden – Unity Line switches to truck check-in without reservations

UncategorizedMarch 21, 2026
by

Night closures of the Mont Blanc Tunnel. Disruptions on the France–Italy corridor

The Mont Blanc Tunnel operator has scheduled maintenance works for March and April 2026, which will result in night-time traffic disruptions. The...

Night closures of the Mont Blanc Tunnel. Disruptions on the France–Italy corridor

UncategorizedMarch 21, 2026
by

The Netherlands closes a tunnel on the route to Belgium

The Dutch infrastructure authority has scheduled a series of night closures of the Drechttunnel on the A16 motorway in 2026. The restrictions, related to...

The Netherlands closes a tunnel on the route to Belgium

UncategorizedMarch 21, 2026

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Avice Group

Avice Group – is an international company. 365 days a year we are engaged in cargo transportation. Delivering cargo even to the farthest corners of Europe.

Appricotsoft.com Development

Head Office

Poland

30-415 Krakow ul. Bonarka 21, PL 

email: [email protected] 

Get Contacts