
Germany: A46 in Düsseldorf completely closed from Friday
The A46 motorway will be completely closed in both directions from August 15, 2025 at 9:00 p.m. until August 18, 2025 at 5:00 a.m.
Due to a scheduled inspection of the load-bearing cables, the Fleher Bridge (a bridge over the Rhine separating Düsseldorf and Neuss) will be entirely closed between the Düsseldorf-Bilk and Neuss-Uedesheim interchanges. A wide detour route has been set up via the Leverkusen and Cologne-North (Köln-Nord) interchanges. The works were originally scheduled for August 1–4 but had to be postponed due to weather conditions. The detours are signposted.
Vollsperrung, A 46, beide Fahrtrichtungen, vom 15.08.2025, 21:00 Uhr bis 18.08.2025, 05:00 Uhr
Für die regelmäßige…
Latest Posts
Cancelled sailings to Sweden – Unity Line switches to truck check-in without reservations
Unity Line has announced further cancellations of scheduled ferry sailings between Świnoujście and ports in Sweden (Trelleborg, Ystad) due to difficult...
Night closures of the Mont Blanc Tunnel. Disruptions on the France–Italy corridor
The Mont Blanc Tunnel operator has scheduled maintenance works for March and April 2026, which will result in night-time traffic disruptions. The...
The Netherlands closes a tunnel on the route to Belgium
The Dutch infrastructure authority has scheduled a series of night closures of the Drechttunnel on the A16 motorway in 2026. The restrictions, related to...