
Germany: A46 in Düsseldorf completely closed from Friday
The A46 motorway will be completely closed in both directions from August 15, 2025 at 9:00 p.m. until August 18, 2025 at 5:00 a.m.
Due to a scheduled inspection of the load-bearing cables, the Fleher Bridge (a bridge over the Rhine separating Düsseldorf and Neuss) will be entirely closed between the Düsseldorf-Bilk and Neuss-Uedesheim interchanges. A wide detour route has been set up via the Leverkusen and Cologne-North (Köln-Nord) interchanges. The works were originally scheduled for August 1–4 but had to be postponed due to weather conditions. The detours are signposted.
Vollsperrung, A 46, beide Fahrtrichtungen, vom 15.08.2025, 21:00 Uhr bis 18.08.2025, 05:00 Uhr
Für die regelmäßige…
Latest Posts
September 15 with exemption from truck bans in Slovakia
The Presidium of the Slovak Police has reviewed the request of the Road Haulage Association of the Slovak Republic, CESMAD Slovakia, and has granted a...
September 15 with exemption from truck bans in Slovakia
Nighttime closures of the Van Brienenoord Bridge on the A16 in Rotterdam – detours and disruptions
In mid-September, drivers will face major disruptions on the A16 motorway in Rotterdam. Due to maintenance works, the Van Brienenoord Bridge will be closed...
Bulgaria: August Restrictions for Trucks on the Trakia Motorway
In August, Bulgaria is introducing additional traffic restrictions for heavy goods vehicles over 12 tonnes on the Trakia Motorway (A1), on the section...