
Germany: A46 in Düsseldorf completely closed from Friday
The A46 motorway will be completely closed in both directions from August 15, 2025 at 9:00 p.m. until August 18, 2025 at 5:00 a.m.
Due to a scheduled inspection of the load-bearing cables, the Fleher Bridge (a bridge over the Rhine separating Düsseldorf and Neuss) will be entirely closed between the Düsseldorf-Bilk and Neuss-Uedesheim interchanges. A wide detour route has been set up via the Leverkusen and Cologne-North (Köln-Nord) interchanges. The works were originally scheduled for August 1–4 but had to be postponed due to weather conditions. The detours are signposted.
Vollsperrung, A 46, beide Fahrtrichtungen, vom 15.08.2025, 21:00 Uhr bis 18.08.2025, 05:00 Uhr
Für die regelmäßige…
Latest Posts
From 2026, trucks over 7.5 t will no longer be allowed on Route 42. Hungary redirects traffic to the M4
Hungary is introducing a ban on trucks over 7.5 tonnes on National Road 42. Transit traffic will be diverted to the M4 motorway.Starting in 2026, vehicles...
Netherlands: Road Disruptions from 12 to 15 December
From Friday, 12 December, to Monday, 15 December, truck drivers in the Netherlands should expect significant disruptions on two major motorway sections: A10...
Netherlands: Road Disruptions from 12 to 15 December
Mont Blanc Tunnel Reopens to Heavy Goods Vehicles. Key Works Completed
The Mont Blanc Tunnel is scheduled to reopen to traffic on Friday, 12 December 2025 at 5:00 p.m., according to TMB-GEIE, the operator responsible for...