Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertJuni 16, 20230 comments

Catalonia: additional restrictions on the AP-7

Additional restrictions for vehicles or combinations of vehicles with a maximum authorised mass of more than 7.5 ton apply on 5, 6 and 7 May

On Friday, 5 May from 3:00 PM to 9:00 PM:
⭕ between KP 126, exit 12B in La Roca del Vallès, Granollers and the connection with the C-60 road, in the municipality of La Roca del Vallés, and KP 172, exit 25 in Martorell and the connection with the A-2 motorway, in the municipality of Martorell, lorries are required to use the right lane and must not overtake other vehicles and drive faster than 80 km/h.
⭕ between KP 172, exit 25 in Martorell and the junction with the A-2, in the municipality of Martorell, and KP 176.6, exit 26 in Gelida and Sant Llorenç d’Hortons, southbound lorries are required to use the right lane and must not overtake other vehicles.

On Saturday, 6 May, from 09:00 AM to 2:00 PM:
⭕ between KP 172, exit 25 in Martorell and the junction with the A-2, in the municipality of Martorell, and KP 176.6, exit 26 in Gelida and Sant Llorenç d’Hortons, southbound lorries are required to use the right lane and must not overtake other vehicles.

On Sunday, 7 May, from 3:00 PM to 10:00 PM:
⭕ With the creation of a lane in the opposite direction between KP 111.1, exit 11 at Sant Celoni and Montseny, in the municipality of Sant Celoni, and KP 133.8, exit 13 at Granollers, Montornés del Vallés and Vilanova del Vallés, lorries (over 7,5 tons) are required to use the right lane and must not overtake other vehicles and drive faster than 80 km/h.
⭕ For the same reason, due to the planned creation of lanes in the opposite direction between KP 213 of the AP-7 motorway, where AP-7 joins AP-2, in the municipality of Banyeres del Penedès and KP 8 of the B-23 road, exit 8 at Sant Feliu de Llobregat and Molins de Rei Sur, lorries (over 7,5 tons) are required to use the right lane and must not overtake other vehicles and drive faster than 80 km/h.

England: Nachtsperrungen von M6 und M42Prev
Deutschland – A7 – Tunnel Altona: Nächtliche EinschränkungenNext

Latest Posts

by

Belgium: night closures between E25 and E40 in Liège starting today. Disruptions for several nights

For the next few nights, an important connection between the E25 and E40 motorways in Liège will be closed. The disruptions will affect the A602 tunnel ring...

Belgium: night closures between E25 and E40 in Liège starting today. Disruptions for several nights

Unkategorisiert, Unkategorisiert, UnkategorisiertApril 20, 2026
by

New vignette rates in Latvia. Trucks will pay more

New road toll rates for heavy transport are now in force in Latvia. The changes took effect on March 1 and apply to vehicles with a gross vehicle weight...

New vignette rates in Latvia. Trucks will pay more

Unkategorisiert, Unkategorisiert, UnkategorisiertApril 20, 2026
by

France: ELO mandatory for trucks travelling to the United Kingdom from April

From April 20, 2026, France will introduce a mandatory ELO system for trucks crossing the border with the United Kingdom. A single barcode will contain all...

France: ELO mandatory for trucks travelling to the United Kingdom from April

Unkategorisiert, Unkategorisiert, UnkategorisiertApril 20, 2026

Leave a Reply Antwort abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten