Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertFebruar 15, 20250 comments

Austria: new HGV driving bans on the A12, A13 and A14 motorways

The Austrian Federal Minister for Climate, Environment, Energy, Mobility, Innovation and Technology has issued a regulation introducing additional HGV driving bans on the A12, A13 and A14 motorways in 2025.

The restriction is related to the general renovation of the Lueg Bridge and will apply on days with high traffic intensity days. It was published in the Federal Law Gazette (RIS – BGBLA_2024_II_409).

The driving ban applies:

❌ to lorries and articulated vehicles with a gross combination mass exceeding 7.5 tonnes.

❌ on A12 Inntal, A13 Brenner and A14 Rheintal/Walgau motorways:
◾ Every Saturday from 11 January to 15 March 2025, from 7:00 a.m. to 3:00 p.m.
◾ on Saturday 12 April, from 7:00 a.m. to 3:00 p.m.
◾ Every Saturday from 7 Juneto 27 September, from 7:00 a.m. to 3:00 p.m.
◾ on Thursday 17 April, Friday 18 April, Wednesday 28 May, Wednesday 18 June and Thursday 2 October, from 7:00 a.m. to 10:00 p.m.
◾ The ban applies if route to the destination leads via the A 13 motorway section from the Nößlach junction to the Brenner Nord junction towards the national border.

❌on the A13 Brenner motorway (from the Italian/Austrian border to the Nößlach junction):
◾ Every Saturday from 11 January to 15 March 2025, from 7:00 a.m. to 3:00 p.m.
◾ Every Saturday from 5 July 2025 to 30 August 2025, from 7:00 a.m. to 3:00 p.m.
◾ The ban applies if the route to your destination leads via the motorway section from the Brenner Nord junction to the Nößlach junction in the direction of Innsbruck.

❗ATTENTION – ASFINAG, in cooperation with local authorities, has prepared a detailed traffic calendar on the Lueg Bridge, which came into force on January 1, 2025.

Update! Austria: exit bans on the A10 motorway to prevent traffic jam avoidancePrev
Italy - additional HGV driving ban on the A22 Brenner motorwayNext

Latest Posts

by

France: Night-time closure of the A40 motorway

Drivers travelling on the A40 in France will face major disruptions during the night of 24–25 November. The section between the Bonneville Zones...

France: Night-time closure of the A40 motorway

Unkategorisiert, UnkategorisiertDezember 16, 2025
by

Tyrol: As Many as 30 Days of Truck Traffic Dosage on the A12 and A13

The Tyrolean authorities have published the official traffic dosage calendar (LKW-Dosierung), which provides for as many as 30 days of controlled truck...

Tyrol: As Many as 30 Days of Truck Traffic Dosage on the A12 and A13

Unkategorisiert, UnkategorisiertDezember 16, 2025
by

Trucks Over 20 Tonnes Banned from Parts of the Road Network in Hungary

Hungarian transport organisations are sounding the alarm over the escalating problem of introducing local restrictions for trucks over 20 tonnes without any...

Trucks Over 20 Tonnes Banned from Parts of the Road Network in Hungary

UnkategorisiertDezember 16, 2025

Leave a Reply Antwort abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten