Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertMärz 21, 20260 comments

A4 in the Netherlands with restrictions – Beneluxtunnel to be closed at night

Recurring maintenance works in the Beneluxtunnel under the Nieuwe Maas will reduce capacity on one of the key transport corridors in western Netherlands, potentially leading to delays in container and intermodal transport.

In 2026, cyclical night-time closures related to routine infrastructure maintenance are scheduled in the Beneluxtunnel on the A4 motorway. For carriers operating to and from the ports of Rotterdam, this means the need to factor in detours and extended transit times.

The A4 is one of the main transport arteries in western Netherlands. It connects the area of The Hague with the Rotterdam metropolitan region and constitutes a vital corridor for container transport, intermodal operations, and regional distribution across the Benelux area. The Beneluxtunnel, running beneath the Nieuwe Maas, is a critical bottleneck on this route. Any reduction in capacity directly affects heavy goods vehicle traffic flow.

Closure schedule – direction Rotterdam/ Pernis

On the following dates, one tunnel tube will be closed in the direction of Pernis/Rotterdam Hoogvliet (always between 21:00 and 05:00):
• 16/17 February (Tube B)
• 17/18 February (Tube A)
• 20/21 February (Tube B)
• 4/5 May (Tube B)
• 5/6 May (Tube A)
• 31 August / 1 September (Tube B)
• 1/2 September (Tube A)
• 16/17 November (Tube B)
• 17/18 November (Tube A)

Closure schedule – direction The Hague

Closures of one tunnel tube in the direction of The Hague (mainly 21:00–05:00):
• 18/19 February (Tube E)
• 19/20 February (Tube D)
• 20/21 February (Tube D – until 22:00)*
• 2/3 March (Tube E)
• 6/7 March (Tube E)
• 6/7 May (Tube E)
• 7/8 May (Tube D)
• 5/6 June (Tube D – until 22:00)*
• 28/29 August (Tube D)*
• 2/3 September (Tube E)
• 3/4 September (Tube D)
• 13/14 November (Tube D)*
• 18/19 November (Tube E)
• 19/20 November (Tube D)

* On selected dates, due to works in the Ketheltunnel (A4), Tube D of the Beneluxtunnel towards The Hague will additionally be closed, which may increase traffic pressure on alternative routes.

Although one tube will remain open in each direction, overall capacity will be reduced and traffic will be channelled through narrowed lanes. In practice, this means that when planning night-time transport operations in the Rotterdam–The Hague region, it is advisable to check current traffic advisories before entering the Netherlands.

Transit through Hungary – Designated Routes Only and Strict Document ControlPrev
Norway confiscates driver cards, questioning the legality of their issuanceNext

Latest Posts

by

Belgium: night closures between E25 and E40 in Liège starting today. Disruptions for several nights

For the next few nights, an important connection between the E25 and E40 motorways in Liège will be closed. The disruptions will affect the A602 tunnel ring...

Belgium: night closures between E25 and E40 in Liège starting today. Disruptions for several nights

Unkategorisiert, Unkategorisiert, UnkategorisiertApril 20, 2026
by

New vignette rates in Latvia. Trucks will pay more

New road toll rates for heavy transport are now in force in Latvia. The changes took effect on March 1 and apply to vehicles with a gross vehicle weight...

New vignette rates in Latvia. Trucks will pay more

Unkategorisiert, Unkategorisiert, UnkategorisiertApril 20, 2026
by

France: ELO mandatory for trucks travelling to the United Kingdom from April

From April 20, 2026, France will introduce a mandatory ELO system for trucks crossing the border with the United Kingdom. A single barcode will contain all...

France: ELO mandatory for trucks travelling to the United Kingdom from April

Unkategorisiert, Unkategorisiert, UnkategorisiertApril 20, 2026

Leave a Reply Antwort abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten