
Netherlands – night closures of the Van Brienenoord bridge in Rotterdam
The Van Brienenoord bridge is 1,320 meters long and is one of the largest arch bridges in Europe. Every day, 230,000 vehicles pass through it.
The bridge will be completely closed during two nights: Monday, August 28, from 10:00 PM to 5:00 AM and on Tuesday, August 29, from 10:00 PM to 5:00 AM. The closure is necessary to conduct renovation work. Both the main and parallel lanes of the A16 from the Ridderster Junction to Van Brienenoord Bridge will be closed.
Diversion routes
❗ Transit traffic will be diverted through the Rotterdam ring road (Benelux tunnel) and the A20, A4 and A15 motorways. The diversion route is marked with yellow and numbered signs above and along the road.
Latest Posts
Border with Bosnia and Herzegovina closed to trucks. Drivers’ protest continues
Since the early morning of September 1, 2025, a protest at the Ličko Petrovo Selo – Izačić border crossing has completely paralyzed freight traffic between...
From 8 September: Changes in traffic management on Slovenia’s H4. Trucks restricted to one lane
On Slovenia’s expressway H4 in the Vipava area, a new traffic management scheme will be introduced starting 8 September 2025. The decision was taken...
Bulgaria introduces temporary truck bans >12 tons at the beginning of September
Carriers planning journeys through Bulgaria must prepare for temporary restrictions on the movement of trucks over 12 tons. The bans are related to the...