Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertJuni 16, 20230 comments

Catalonia: additional restrictions on the AP-7

Additional restrictions for vehicles or combinations of vehicles with a maximum authorised mass of more than 7.5 ton apply on 5, 6 and 7 May

On Friday, 5 May from 3:00 PM to 9:00 PM:
⭕ between KP 126, exit 12B in La Roca del Vallès, Granollers and the connection with the C-60 road, in the municipality of La Roca del Vallés, and KP 172, exit 25 in Martorell and the connection with the A-2 motorway, in the municipality of Martorell, lorries are required to use the right lane and must not overtake other vehicles and drive faster than 80 km/h.
⭕ between KP 172, exit 25 in Martorell and the junction with the A-2, in the municipality of Martorell, and KP 176.6, exit 26 in Gelida and Sant Llorenç d’Hortons, southbound lorries are required to use the right lane and must not overtake other vehicles.

On Saturday, 6 May, from 09:00 AM to 2:00 PM:
⭕ between KP 172, exit 25 in Martorell and the junction with the A-2, in the municipality of Martorell, and KP 176.6, exit 26 in Gelida and Sant Llorenç d’Hortons, southbound lorries are required to use the right lane and must not overtake other vehicles.

On Sunday, 7 May, from 3:00 PM to 10:00 PM:
⭕ With the creation of a lane in the opposite direction between KP 111.1, exit 11 at Sant Celoni and Montseny, in the municipality of Sant Celoni, and KP 133.8, exit 13 at Granollers, Montornés del Vallés and Vilanova del Vallés, lorries (over 7,5 tons) are required to use the right lane and must not overtake other vehicles and drive faster than 80 km/h.
⭕ For the same reason, due to the planned creation of lanes in the opposite direction between KP 213 of the AP-7 motorway, where AP-7 joins AP-2, in the municipality of Banyeres del Penedès and KP 8 of the B-23 road, exit 8 at Sant Feliu de Llobregat and Molins de Rei Sur, lorries (over 7,5 tons) are required to use the right lane and must not overtake other vehicles and drive faster than 80 km/h.

England: Nachtsperrungen von M6 und M42Prev
Deutschland – A7 – Tunnel Altona: Nächtliche EinschränkungenNext

Latest Posts

by

Hungary: Truck traffic ban suspended overnight from July 26 to 27 due to heatwave

The Hungarian Ministry of Construction and Transport, at the request of the national hauliers' association MKFE, has temporarily relaxed the weekend truck...

Hungary: Truck traffic ban suspended overnight from July 26 to 27 due to heatwave

Unkategorisiert, Unkategorisiert, UnkategorisiertSeptember 7, 2025
by

Hungary lifts night truck traffic ban on August 9–10 due to heatwave

Due to a heatwave, the night truck traffic ban for vehicles over 7.5 tonnes GVW will be temporarily lifted in Hungary from Saturday to Sunday night (9–10...

Hungary lifts night truck traffic ban on August 9–10 due to heatwave

Unkategorisiert, Unkategorisiert, UnkategorisiertSeptember 7, 2025
by

11 – 14 August: Night-time traffic interruptions in the Fréjus Tunnel

The Fréjus Tunnel operator has announced planned short-term closures of the facility from 11 to 14 August 2025.Since the opening of the tunnel’s second...

11 – 14 August: Night-time traffic interruptions in the Fréjus Tunnel

Unkategorisiert, Unkategorisiert, UnkategorisiertSeptember 7, 2025

Leave a Reply Antworten abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten