
Belgium: HGV traffic redirected to the main roads starting from November
From Monday, November 4, the local authorities of Steenokkerzeel, Kampenhout, Kortenberg and Herent introduce a route coordination scheme for HGV traffic (tonnage limitation, maximum permissible weight of 3.5 tons) at inter-municipal level.
GHV through traffic will have to use the main roads – Haachtsesteenweg (N21), Tervuursesteenweg (N227), Brusselsesteenweg (N2) and Leuvense-/Mechelsesteenweg (N26). This restriction only applies to freight vehicles in through traffic. Local freight traffic (e.g. deliveries) is permitted even if the GVW exceeds the limit of 3.5 tons.
Latest Posts
A7 in Hamburg and the Elbe Tunnel – Full Weekend Closure
This coming weekend, drivers traveling on the A7 motorway near Hamburg must prepare for significant disruptions. From March 28 to March 31, the section...
A complete closure of the bridge on the border between Romania and Bulgaria
The road-rail bridge over the Danube connecting Giurgiu (Romania) and Ruse (Bulgaria) will be closed on March 27, starting from 9:00 AM. During the closure...
Belgium: the Bolivar Tunnel in Antwerp closed for 10 nights
The Bolivar Tunnel, which connects Leien with the A112 motorway and the Antwerp ring road (R1), is scheduled for maintenance work between the 16th and 28th...