
Germany: A46 in Düsseldorf completely closed from Friday
The A46 motorway will be completely closed in both directions from August 15, 2025 at 9:00 p.m. until August 18, 2025 at 5:00 a.m.
Due to a scheduled inspection of the load-bearing cables, the Fleher Bridge (a bridge over the Rhine separating Düsseldorf and Neuss) will be entirely closed between the Düsseldorf-Bilk and Neuss-Uedesheim interchanges. A wide detour route has been set up via the Leverkusen and Cologne-North (Köln-Nord) interchanges. The works were originally scheduled for August 1–4 but had to be postponed due to weather conditions. The detours are signposted.
Vollsperrung, A 46, beide Fahrtrichtungen, vom 15.08.2025, 21:00 Uhr bis 18.08.2025, 05:00 Uhr
Für die regelmäßige…
Latest Posts
Norway relaxes regulations for truck drivers after landslide on E6 route
Following a landslide in Levanger, Norway, which blocked a key section of the E6 transport route, authorities have introduced extraordinary measures for...
Austria: Night-time closures of the Arlberg Tunnel from 22 September this year
The Arlberg Tunnel on Austria’s S16 road will be completely closed due to maintenance works from Monday, 22 September to Friday, 26 September 2025, each...
Belgium: Night closures of the E25/E40 connection at the Burenville interchange
Drivers in Belgium face further disruptions. Due to renovation works on the bridge at interchange no. 33 Burenville, night closures of the E25/E40...