
Germany: complete closure of A43 in the direction of Münster
The closure is due to the construction work on the Deutsche Bahn bridge parallel to the Cranger Straße bridge.
As already announced, the A43 will be closed between Herne-Eickel and the Recklinghausen junction from 9 PM on Friday (July 1) to 5 AM on Monday (July 4). ❗All through traffic is diverted via the A40 and the A45.❗
The full closure is being used as an opportunity to carry out additional maintenance work on the motorway. For this reason, only one lane is temporarily available in the direction of Wuppertal near the barrier system south of the Recklinghausen junction.
Latest Posts
Easter truck driving bans in Poland. One provision makes the difference
During the Easter period in Poland, additional traffic bans apply to trucks with a gross vehicle weight exceeding 12 tonnes. The restrictions will cover...
Romania will shut down the toll system. Drivers will not be able to buy a vignette
CNAIR has announced a planned technical interruption that will affect the ability to purchase vignettes and pay road tolls in Romania.On Wednesday, April 8,...
Major disruptions ahead in Germany – A2 motorway closed, A4 with night closures
April brings significant disruptions on German motorways. According to Die Autobahn GmbH des Bundes, the A2 motorway in Dortmund will be completely closed...