Avice Group

  • Home
  • About
  • Work
  • News
  • Contacts
  • English
    • Polski (Polish)
    • Русский (Russian)
    • Deutsch (German)

Avice Group

  • Home
  • About
  • Work
  • News
  • Contacts
  • English
    • Polski (Polish)
    • Русский (Russian)
    • Deutsch (German)
  • Home
  • About
  • Work
  • News
  • Contacts
  • English
    • Polski (Polish)
    • Русский (Russian)
    • Deutsch (German)
by
UncategorizedFebruary 18, 20260 comments

RN20 France–Andorra closed for weeks

The main route linking France with Andorra, RN20, is impassable on the Ax-les-Thermes – Mérens-les-Vals section following a serious rockslide on 31 January.

Approximately 100 m³ of rock fell onto the road from a height of around 250 m, destroying about 100 metres of carriageway. Due to the risk of further rockfalls, the poor condition of the road and unfavourable weather conditions, the Prefecture of the Ariège department has officially extended the closure “until further notice and most likely for several weeks”.

RN20 is the main access road from France to Andorra and is regularly used by heavy goods vehicles carrying out destination traffic (deliveries, loading/unloading).
The current closure of RN20 means that heavy goods vehicles are unable to pass in either direction. The designated diversion route is not accessible to trucks. As a result, road deliveries to Andorra are severely disrupted or impossible.

Transport operations must therefore be:
– postponed,
– reoranised (rail transport combined with local distribution),
– or rerouted via Spain (longer and more costly).

Fréjus Tunnel: Night Closures February 9–28, Delays Up to 45 MinutesPrev
Bonn-Nord Bridge closed to heavy goods vehicles from 9 FebruaryNext

Latest Posts

by

Mont Blanc Tunnel Night Closures – Schedule Through August 2026

From today, night‑time traffic restrictions are in effect in the Mont Blanc Tunnel. The tunnel operator has published a forecast schedule of planned...

Mont Blanc Tunnel Night Closures – Schedule Through August 2026

UncategorizedFebruary 18, 2026
by

First Border Crossings Unblocked. Situation in the Balkans is Changing

After several days of truckers’ protests in the Balkans, the first signs of improvement have emerged. In North Macedonia, border crossings for freight...

First Border Crossings Unblocked. Situation in the Balkans is Changing

UncategorizedFebruary 18, 2026
by

Düsseldorf: Theodor-Heuss Bridge closed to heavy vehicles from February 1

From today (February 1, 2026), a full traffic ban applies on the Theodor-Heuss Bridge in Düsseldorf for vehicles with a gross vehicle weight exceeding 3.5...

Düsseldorf: Theodor-Heuss Bridge closed to heavy vehicles from February 1

UncategorizedFebruary 18, 2026

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Avice Group

Avice Group – is an international company. 365 days a year we are engaged in cargo transportation. Delivering cargo even to the farthest corners of Europe.

Appricotsoft.com Development

Head Office

Poland

30-415 Krakow ul. Bonarka 21, PL 

email: [email protected] 

Get Contacts