Avice Group

  • Home
  • About
  • Work
  • News
  • Contacts
  • English
    • Polski (Polish)
    • Русский (Russian)
    • Deutsch (German)

Avice Group

  • Home
  • About
  • Work
  • News
  • Contacts
  • English
    • Polski (Polish)
    • Русский (Russian)
    • Deutsch (German)
  • Home
  • About
  • Work
  • News
  • Contacts
  • English
    • Polski (Polish)
    • Русский (Russian)
    • Deutsch (German)
by
UncategorizedJanuary 18, 20260 comments

Great St. Bernard Tunnel: night-time closures and alternating traffic in 2026

The operator of the Great St. Bernard Tunnel (Sitrasb SpA) has confirmed that night-time renovation works related to the replacement of the ventilation slab will continue in 2026. The works will involve temporary closures and alternating one-way traffic and may affect route planning in international transport between Italy, Switzerland and France.

The works will be carried out exclusively at night, from 22:00 to 06:00. No works are scheduled on Friday–Saturday and Saturday–Sunday nights, in order to limit disruptions to daytime and tourist traffic. During the works, alternating one-way traffic (senso unico alternato) will be in place at the tunnel entrances, with vehicles being allowed through alternately.

⭕ A height restriction will also apply during night-time works: only vehicles with a height of up to 3.00 m will be permitted to enter the tunnel. During the daytime, transit will take place without additional restrictions.

According to the published schedule, night-time works will be carried out during the following periods:
• 11 January – 2 April 2026
• 13 April – 8 May 2026
• 19 May – 26 June 2026

During the summer and autumn months, traffic in the tunnel is expected to operate without disruptions. An exception will be 15 September 2026, when the tunnel will be completely closed in both directions from 19:30 to 01:00 due to Italian–Swiss safety exercises.

Germany: Munich Closes Landshuter Allee Tunnel to TrucksPrev
Italy introduces extraordinary truck bans during the Olympic GamesNext

Latest Posts

by

Cancelled sailings to Sweden – Unity Line switches to truck check-in without reservations

Unity Line has announced further cancellations of scheduled ferry sailings between Świnoujście and ports in Sweden (Trelleborg, Ystad) due to difficult...

Cancelled sailings to Sweden – Unity Line switches to truck check-in without reservations

UncategorizedMarch 21, 2026
by

Night closures of the Mont Blanc Tunnel. Disruptions on the France–Italy corridor

The Mont Blanc Tunnel operator has scheduled maintenance works for March and April 2026, which will result in night-time traffic disruptions. The...

Night closures of the Mont Blanc Tunnel. Disruptions on the France–Italy corridor

UncategorizedMarch 21, 2026
by

The Netherlands closes a tunnel on the route to Belgium

The Dutch infrastructure authority has scheduled a series of night closures of the Drechttunnel on the A16 motorway in 2026. The restrictions, related to...

The Netherlands closes a tunnel on the route to Belgium

UncategorizedMarch 21, 2026

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Avice Group

Avice Group – is an international company. 365 days a year we are engaged in cargo transportation. Delivering cargo even to the farthest corners of Europe.

Appricotsoft.com Development

Head Office

Poland

30-415 Krakow ul. Bonarka 21, PL 

email: [email protected] 

Get Contacts