{"id":26475,"date":"2026-03-21T00:00:34","date_gmt":"2026-03-21T00:00:34","guid":{"rendered":"http:\/\/news.2728.html"},"modified":"2026-03-21T00:00:34","modified_gmt":"2026-03-21T00:00:34","slug":"belgium-night-closures-of-a602-will-affect-transport-between-germany-and-luxembourg","status":"publish","type":"post","link":"http:\/\/avicegroup.com\/de\/belgium-night-closures-of-a602-will-affect-transport-between-germany-and-luxembourg\/","title":{"rendered":"Belgium: Night closures of A602 will affect transport between Germany and Luxembourg"},"content":{"rendered":"<h1 class=\"ui header\">\n<div class=\"sub header\">Five night-time closures of the strategic E25\u2013E40 (A602) motorway link are scheduled in the Li\u00e8ge area. The restrictions will affect traffic in both directions between the \u201cAvroy\/Laveu\u201d and \u201cCh\u00ean\u00e9e\u201d interchanges and may impact international transport, particularly on the Germany\u2013Belgium\u2013Luxembourg corridor.<\/div>\n<\/h1>\n<p style=\"font-size:1.1rem\">The link will be completely closed from 22:00 to 06:00 (exit ramps will be gradually closed from 20:30, and traffic will be restored from 05:00) on the following nights:<br \/>\n\u2022 March 8\/9<br \/>\n\u2022 March 9\/10<br \/>\n\u2022 March 10\/11<br \/>\n\u2022 March 11\/12<br \/>\n\u2022 March 12\/13<\/p>\n<p>The works are maintenance-related; however, due to the importance of this section for international traffic, disruptions in transit should be expected, especially on the Germany\u2013Belgium\u2013Luxembourg axis.<\/p>\n<h3>Official diversion routes have been designated for the closure period:<\/h3>\n<p> \u274c Route S1 (for vehicles coming from Loncin):<br \/>\nA604 \u2192 N617 \u2192 Fragn\u00e9e and F\u00e9tinne bridges \u2192 N633 \u2192 N30 \u2192 N601 (Quai des Ardennes \u2013 Boulevard de l\u2019Ourthe) \u2192 E25\/A26 towards Luxembourg.<\/p>\n<p>\u274c Route B (for vehicles coming from Luxembourg via E25\/A26):<br \/>\nN30 \u2192 N90 (Meuse riverbanks) \u2192 E25\/A25 to the Cheratte interchange (E25\/A25\u2013E40\/A3).<\/p>\n<p>Additionally, during the night works, signage may also be extended to access sections between the \u201cEmbourg\u201d and \u201cCh\u00ean\u00e9e\u201d exits and between the Loncin interchange and \u201cAvroy\/Laveu\u201d for additional maintenance works.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Five night-time closures of the strategic E25\u2013E40 (A602) motorway link are scheduled in the Li\u00e8ge area. The restrictions will affect traffic in both directions between the \u201cAvroy\/Laveu\u201d and \u201cCh\u00ean\u00e9e\u201d interchanges and may impact international transport, particularly on the Germany\u2013Belgium\u2013Luxembourg corridor. The link will be completely closed from 22:00 to 06:00 (exit ramps will be gradually [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":26476,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"http:\/\/avicegroup.com\/de\/wp-json\/wp\/v2\/posts\/26475"}],"collection":[{"href":"http:\/\/avicegroup.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/avicegroup.com\/de\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"http:\/\/avicegroup.com\/de\/wp-json\/wp\/v2\/comments?post=26475"}],"version-history":[{"count":0,"href":"http:\/\/avicegroup.com\/de\/wp-json\/wp\/v2\/posts\/26475\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/avicegroup.com\/de\/wp-json\/wp\/v2\/media\/26476"}],"wp:attachment":[{"href":"http:\/\/avicegroup.com\/de\/wp-json\/wp\/v2\/media?parent=26475"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/avicegroup.com\/de\/wp-json\/wp\/v2\/categories?post=26475"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/avicegroup.com\/de\/wp-json\/wp\/v2\/tags?post=26475"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}