Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertAugust 21, 20250 comments

Traffic Disruptions on the S1 Route – Laliki Tunnel Temporarily Closed

Drivers traveling on the S1 expressway toward the Zwardoń border crossing should prepare for significant traffic disruptions. The road tunnel in Laliki will be temporarily closed to traffic, and detours will be in place for both passenger cars and heavy goods vehicles.

The disruptions will begin on July 21, 2025, at 06:00 and will continue until August 18, 2025, at 06:00. During the closure period, traffic will be redirected to designated detour routes. Drivers are advised to exercise particular caution and follow temporary road signage.

➡️ Heavy goods vehicles will be redirected to other border crossings. The recommended detour route for freight traffic is via Cieszyn.

➡️ Passenger vehicles will be diverted along a local road through the center of Laliki, using the former DK69 route (now a municipal road) between the Rajcza and Laliki interchanges.

Abolition of the 25-Hour Parking Limit at State-Owned Motorway Parking Areas in DenmarkPrev
Notice: Weekend Closure of the Považský Chlmec Tunnel on the D3 in SlovakiaNext

Latest Posts

by

Night works in the Beneluxtunnel. A4 completely closed on 8-9 December

During the night of 8–9 December 2025, drivers will face major disruptions on the A4 route in the Rotterdam area. Rijkswaterstaat has announced a complete...

Night works in the Beneluxtunnel. A4 completely closed on 8-9 December

UnkategorisiertJanuar 7, 2026
by

Emergency Closure of the Branisko Tunnel in Slovakia

The Polícia SR – Prešovský kraj has announced an emergency closure of the Branisko Tunnel on the D1 motorway in the Prešov region.The restrictions apply to...

Emergency Closure of the Branisko Tunnel in Slovakia

Unkategorisiert, UnkategorisiertDezember 22, 2025
by

Disruptions on Key Transit Route – D1 in Slovakia Temporarily Closed

During the last November weekend, from Saturday, 29 November at 10:00 until Sunday, 30 November in the afternoon, a temporary closure of the D1 motorway...

Disruptions on Key Transit Route – D1 in Slovakia Temporarily Closed

Unkategorisiert, UnkategorisiertDezember 22, 2025

Leave a Reply Antwort abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten