Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertMärz 1, 20250 comments

Traffic disruptions in the Fréjus Tunnel – schedule of closures and alternating traffic

Drivers travelling through the Fréjus Tunnel must prepare for temporary traffic disruptions. Owing to maintenance work, which started on February 3 and will continue until March 3, the organisation of traffic has been changed.

The greatest disruption will occur on 26 February (Wednesday) when the tunnel will be completely closed from 00:00 to 05:00. During this time, drivers will have to use alternative routes.

Alternating traffic at night

From Monday to Friday alternating traffic along the entire length of the tunnel may cause additional delays. Since no work will be carried out on Saturday and Sunday evenings, traffic disruptions are not expected during these times.

Detailed schedule of closures and traffic management in the Fréjus Tunnel for February 2025

France: additional driving bans in winter and summer monthsPrev
Watch out for misleading satnav directions: the lorry checkpoint on the A13 in Austria is closedNext

Latest Posts

by

France: Night-time closure of the A40 motorway

Drivers travelling on the A40 in France will face major disruptions during the night of 24–25 November. The section between the Bonneville Zones...

France: Night-time closure of the A40 motorway

Unkategorisiert, UnkategorisiertDezember 16, 2025
by

Tyrol: As Many as 30 Days of Truck Traffic Dosage on the A12 and A13

The Tyrolean authorities have published the official traffic dosage calendar (LKW-Dosierung), which provides for as many as 30 days of controlled truck...

Tyrol: As Many as 30 Days of Truck Traffic Dosage on the A12 and A13

Unkategorisiert, UnkategorisiertDezember 16, 2025
by

Trucks Over 20 Tonnes Banned from Parts of the Road Network in Hungary

Hungarian transport organisations are sounding the alarm over the escalating problem of introducing local restrictions for trucks over 20 tonnes without any...

Trucks Over 20 Tonnes Banned from Parts of the Road Network in Hungary

UnkategorisiertDezember 16, 2025

Leave a Reply Antwort abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten