Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertFebruar 13, 20250 comments

Tirol: traffic restrictions on the Lueg Bridge in 2025

In cooperation with the local authorities, the ministry and partners, ASFINAG has prepared a detailed schedule of traffic measures on the Lueg Bridge, which comes into effect on 1 January 2025.

The schedule is supposed to to enable drivers to plan their journeys on the A13 motorway once single-lane traffic on the bridge is in place. The measure is necessary to reduce the load exerted on the bridge and ensure traffic safety. Innovative traffic management solutions will be used to minimise disruptions, but drivers should expect periodic changes and adapt their travel plans to the new conditions.

Two-lane traffic on selected days

To minimise disruptions, ASFINAG plans to allow two-lane traffic in each difrection on 180 days when traffic intensity is predicted to be much higher. On these days:

❌ Vehicles with a GVW of over 3.5 tons will be obliged to use the inner lane (closest to the middle of the bridge).
❌ Cars will be able to use both lanes.
Depending on the situation, two-lane traffic will be enabled on the southbound or the northbound carriageway, or in both directions at the same time.

Schedule of restrictions❗

HGV driving bans

Despite two-lane traffic, considerable traffic jams may occur on some days. This is why there will be 14 days with an HGV driving ban for vehicles with a GVW of over 7.5 tons on the southbound carriageway. In total, in 2025, there will be:

❌ 36 days with an HGV driving ban on the southbound carriageway,
❌ 21 days with an HGV driving ban on the northbound carriageway.

Schedule of restrictions ❗

Intensive preparations for the introduction of the new traffic organization have been underway for several months. Work will continue in 2025 according to the following schedule:
❌ January 1, 2025 – the introduction of single-lane traffic on the bridge.
❌ end of January 2025 – weather permitting, first days with two-lane traffic.
❌ Spring 2025 – completion of the installation of the automated traffic control and management system.
In the event of snowfall, two-lane traffic cannot be introduced because snow removal trucks will not be able to use the outer lanes of the bridge.

Maintenance operations in the Fréjus TunnelPrev
Update! Austria: exit bans on the A10 motorway to prevent traffic jam avoidanceNext

Latest Posts

by

France: exemptions from truck bans in Normandy and western regions. Closures, restrictions and liftings

French prefectures have introduced exemptions from Sunday bans on heavy goods vehicles over 7.5 tonnes in Normandy and western France. At the same time,...

France: exemptions from truck bans in Normandy and western regions. Closures, restrictions and liftings

Unkategorisiert, Unkategorisiert, UnkategorisiertFebruar 18, 2026
by

Spain-France Border Open for Trucks: Biriatou Reopened, Carrier Losses Increasing

After several days of extraordinary restrictions, the authorities of the Basque Country have lifted the transit ban for trucks over 7.5 tons heading towards...

Spain-France Border Open for Trucks: Biriatou Reopened, Carrier Losses Increasing

Unkategorisiert, Unkategorisiert, UnkategorisiertFebruar 18, 2026
by

Germany: Königshainer Berge Tunnel Closed in the Direction of Aachen and Dresden

Due to the final phase of the modernization of the Königshainer Berge Tunnel on the A4 motorway, the direction towards Aachen/Dresden will be completely...

Germany: Königshainer Berge Tunnel Closed in the Direction of Aachen and Dresden

Unkategorisiert, Unkategorisiert, UnkategorisiertFebruar 18, 2026

Leave a Reply Antwort abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten