Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertDezember 10, 20250 comments

The Wiehltal Bridge is bursting at the seams. Germany’s A4 may be closed due to overloaded trucks

Truck traffic on the A4 section in the Bergisches Land region continues to pose a serious challenge. The Wiehltal Bridge is operating beyond its permissible load capacity despite the relief measures introduced in December 2024. The route operator, Autobahn GmbH, and ADAC warn that if the situation does not improve, a full closure of this key transport link may become necessary.

Autobahn GmbH emphasizes that both overloaded trucks exceeding the permissible gross vehicle weight and improperly loaded combinations with excessive axle loads continue to use the bridge. For this reason, authorities are appealing to drivers to strictly follow the regulations: no vehicles over 44 tonnes, maintaining a minimum distance of 50 metres between trucks, and rigorous compliance with axle load limits.

ADAC Nordrhein highlights the potential economic consequences of a possible closure. It stresses that costs for the economy could reach hundreds of millions of euros annually, and that truck drivers and freight operators in the region would be forced to cover additional detour kilometres amounting to millions in total – not per individual vehicle, but the cumulative distance of all transport traffic affected. As a result, fuel costs, CO₂ emissions and congestion levels would rise. ADAC also calls for consistent checks of overloading and distance compliance, as well as considering – as a “last resort” – the installation of a barrier with a scale at the bridge entrances near the Bielstein and Gummersbach exits.

For the transport industry, the A4 in this region is a strategic east-west corridor. Any disruption to traffic entails significant risks of delays, additional costs and the need for rerouting. Logistics companies and drivers must take possible restrictions into account, comply with weight and distance regulations, and monitor announcements from the route operator. The Wiehltal Bridge remains a critical point in the transport network. Overloading and the risk of a full closure require action from drivers, transport companies and authorities. The most important measures remain adhering to the 44-tonne limit, maintaining proper distance and avoiding axle overloading – otherwise, a closure of the route is possible.

Slovakia: New Penalties for Drivers and Fewer Restrictions for Trucks During HolidaysPrev
New Restrictions for Trucks in Austria. B317, B320 and B114 Bans ReinstatedNext

Latest Posts

by

Night works in the Beneluxtunnel. A4 completely closed on 8-9 December

During the night of 8–9 December 2025, drivers will face major disruptions on the A4 route in the Rotterdam area. Rijkswaterstaat has announced a complete...

Night works in the Beneluxtunnel. A4 completely closed on 8-9 December

UnkategorisiertJanuar 7, 2026
by

Emergency Closure of the Branisko Tunnel in Slovakia

The Polícia SR – Prešovský kraj has announced an emergency closure of the Branisko Tunnel on the D1 motorway in the Prešov region.The restrictions apply to...

Emergency Closure of the Branisko Tunnel in Slovakia

Unkategorisiert, UnkategorisiertDezember 22, 2025
by

Disruptions on Key Transit Route – D1 in Slovakia Temporarily Closed

During the last November weekend, from Saturday, 29 November at 10:00 until Sunday, 30 November in the afternoon, a temporary closure of the D1 motorway...

Disruptions on Key Transit Route – D1 in Slovakia Temporarily Closed

Unkategorisiert, UnkategorisiertDezember 22, 2025

Leave a Reply Antwort abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten