Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertOktober 23, 20240 comments

Salzburg: The HGV driving ban the B159 lifted until June 2025

Owing to the general renovation of the Ofenauer, Hiefler, Brentenberg, Zetzenberg and Helbersberg tunnels on the A10 motorway, which ism scheduled to take place from 9 September 2024 to 26 June 2025, the driving ban for vehicles with a GVW of over 7.5 t on the B159 Salzachtal Straße from km 34.4 +35m to km 35.2 +64m (in the village of Tenneck) will be lifted for throughout the period.

As a result of the renovation, only one lane will be available for traffic in each direction along this 14-kilometer section of the A10. In addition, a driving ban for vehicles wider than 3.20 m will come into effect along the entire section of the A10 affected by the renovation work. Special transports that cannot be diverted (e.g. to the Liebherr plant) will have to use the B159 Salzachtal Straße. The A10 exit will be closed for the entire renovation period. Depending on circumstances (e.g. traffic volume, the dosing of HGV traffic before the Helbersberg tunnel or the Ofenauer and Hiefler tunnels), the A10 exits towards Werden and Pass Lueg towards Salzburg must be closed. These disruptions will cause serious restrictions for regional commercial traffic (e.g. to the Sulzau industrial area, where there are gravel factories, asphalt plants, etc.). Experience from previous renovations of the A10 is another argument in favour of lifting the driving ban. Since the motorway exit closures are likely to increase travel times on this route, trcuks will be allowed to travel use the B159 Salzachtal Straße through the village of Tenneck for the duration of the renovation.

Austria: exits on the A10 motorway blocked to prevent drivers from avoiding traffic jamsPrev
Traffic disruptions in Belgium, Germany, France and the RD66 between France and SpainNext

Latest Posts

by

Traffic Disruptions in Hungary Due to the Tour de Hongrie – List of Road Closures and Detours

The Tour de Hongrie 2025 kicks off on May 13, and drivers across Hungary – including in Budapest – should expect temporary road closures and detours due to...

Traffic Disruptions in Hungary Due to the Tour de Hongrie – List of Road Closures and Detours

UnkategorisiertJuni 28, 2025
by

Germany Tightens Border Controls – Drivers Should Expect Delays

The new German federal government, following the announcements of Interior Minister Alexander Dobrindt, is introducing even stricter controls at national...

Germany Tightens Border Controls – Drivers Should Expect Delays

UnkategorisiertJuni 28, 2025
by

Closed Access to A2 towards Świecko. Detours via DK92 from May 17

Starting May 17, the first phase of pavement renovation will begin at the Poznań Wschód motorway interchange, where the A2 motorway intersects with the S5...

Closed Access to A2 towards Świecko. Detours via DK92 from May 17

UnkategorisiertJuni 26, 2025

Leave a Reply Antworten abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten