Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertAugust 9, 20230 comments

Operation Brock contraflow is back

The Operation Brock contraflow system on the M20 in Kent will be deployed from Friday 14 July ahead of the summer holidays and expected high passenger numbers.

Operation Brock is part of a series of measures to improve Kent’s resilience and ensure the smooth flow of traffic through the region in the event of disruption to services across the English Channel.  

To ensure safe deployment of the contraflow system, the M20 will be closed as follows:
• 9pm Tuesday 11 July to 6am Wednesday 12 July: Coast bound carriageway between junction 9 and junction 8
• 8pm Thursday 13 July to 6am Friday 14 July: London bound carriageway between junction 9 and junction 8, coast bound carriageway between junction 7 and junction 9

Fully signed diversion routes will be place while the M20 is closed overnight. These times have been chosen to minimise disruption to road users. When the M20 reopens at 6am on Friday 14 July, the Operation Brock contraflow will be in place and all signs and signals should be followed.

Once the barrier is in place, all HGVs heading for the Port of Dover or Eurotunnel must follow the signs to join Operation Brock at M20 junction 8.  

Any EU-bound HGVs not complying with signage and trying to use another route to Eurotunnel or the Port of Dover risk a fine of £300. They will also be sent to the back of the queue by Police or enforcement agents, wasting time, fuel, and money. This includes trying to bypass the M20 by using the M2/A2 at Brenley Corner. All other coast bound traffic – including local freight and car drivers heading for the continent – should follow the signs and cross over to enter the contraflow on the M20 London bound carriageway.  

Anyone planning to use Eurotunnel and the Port of Dover are advised to plan their journeys and check with the travel operator before setting out. They should also allow more time for their journeys and make sure they are prepared for delays, so should have plenty of fuel, warm clothes, and supplies such as food and drink. The contraflow is expected to be in place for two weeks.   

Bedeutet ein Feiertag immer ein Fahrverbot?Prev
Slowenien – zusätzliche Lkw-Fahrverbote vom 12. bis 15. AugustNext

Latest Posts

by

Slovakia: Partial Closure of the D1 Motorway Before Bratislava

Drivers planning to travel on the D1 motorway towards Bratislava should expect traffic disruptions this coming weekend.According to the Slovak road operator...

Slovakia: Partial Closure of the D1 Motorway Before Bratislava

Unkategorisiert, UnkategorisiertSeptember 25, 2025
by

Belgium: Night Closures of the Liefkenshoek Tunnel

Truck drivers planning to pass through the Liefkenshoek Tunnel (R2, Antwerp) should expect night-time disruptions.The operator has announced maintenance...

Belgium: Night Closures of the Liefkenshoek Tunnel

UnkategorisiertSeptember 25, 2025
by

Trucks Diverted in the Ravenna Area – Disruptions to Deliveries to Port Terminals

From August 18 to September 7, significant restrictions on truck traffic are in place on the SS16 Adriatica in the Ravenna area. ANAS has introduced a ban...

Trucks Diverted in the Ravenna Area – Disruptions to Deliveries to Port Terminals

UnkategorisiertSeptember 15, 2025

Leave a Reply Antworten abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten