Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertSeptember 23, 20220 comments

New tolls in Biscay

In view of financial and environmental impacts of road transport, charges proportionate to the costs incurred have been established for all users of toll roads.

The regional law introduces and regulates tolls for the use of the following road sections:
a) A-8 Autopista del Cantábrico and BI-10, from Basurto (KP 119,500) to El Haya (KP 139,219).
b) N-240 Tarragona – Bilbao (Barazar), from the intersection of El Gallo (KP 55,773) to la variante Ubidea (KP 23,050).
c) N-636 Beasain – Durango (Kanpazar) from the Gipuzkoa border point (KP 34,980) to Durango (KP 49,350).
d) BI-30 (former N-637) Cruces- Erletxes (Rontegi), between the Cruces junction (KP 8,000) and the Erletxes junction (KP 28,180).
e) BI-625 from Laudio (KP 372,560) to Basauri (KP 387,310).
Tolls will apply to vehicles with a GVM above 3.5 tonnes and will be charged at two rates – for vehicles with a GVM of over 3.5 tonnes but not exceeding 12 tonnes (category I) and vehicles with a GVM of 12 tonnes or more (category II). The rates will also depend on the EURO category of a given vehicle. Tolls will be collected electronically.

Lkw-Fahrverbot auf dem A2 Abschnitt der Autobahnring PosensPrev
Katalonien – zusätzliche Beschränkungen für LkwNext

Latest Posts

by

Night works in the Beneluxtunnel. A4 completely closed on 8-9 December

During the night of 8–9 December 2025, drivers will face major disruptions on the A4 route in the Rotterdam area. Rijkswaterstaat has announced a complete...

Night works in the Beneluxtunnel. A4 completely closed on 8-9 December

UnkategorisiertJanuar 7, 2026
by

Emergency Closure of the Branisko Tunnel in Slovakia

The Polícia SR – Prešovský kraj has announced an emergency closure of the Branisko Tunnel on the D1 motorway in the Prešov region.The restrictions apply to...

Emergency Closure of the Branisko Tunnel in Slovakia

Unkategorisiert, UnkategorisiertDezember 22, 2025
by

Disruptions on Key Transit Route – D1 in Slovakia Temporarily Closed

During the last November weekend, from Saturday, 29 November at 10:00 until Sunday, 30 November in the afternoon, a temporary closure of the D1 motorway...

Disruptions on Key Transit Route – D1 in Slovakia Temporarily Closed

Unkategorisiert, UnkategorisiertDezember 22, 2025

Leave a Reply Antwort abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten