
Hungary: closure of the Pentele Bridge
On Friday, April 11 at 5:00 p.m., the Pentele Bridge on the M8 route, which connects Dunaújváros and Dunavecse, will be completely closed. The work will last until 7:00 p.m on Sunday, April 13. During the closure, no vehicles will be able to cross the bridge.
The bridge needs to be closed to enable modernization work, which involves the replacement of the load-bearing elements of the bridge structure and the rebuilding of its technical infrastructure. The renovation will be carried out in stages throughout the year during similar weekend closures.
A diversion route has been for heavy goods vehicles with a GVW up to 40 tons, along the national road no. 52, across the bridge between Solt and Dunaföldvár, which the only alternative bridge crossing in the region, located approximately 15 km south of the M8 route.
Latest Posts
Switzerland to Close A4 in Schaffhausen – Trucks to Be Stranded Due to German Public Holiday
In connection with the upcoming Feast of Corpus Christi, which will be observed in Germany on June 19, 2025, the Swiss authorities are preparing for a...
Bulgaria Introduces Temporary Truck Bans Due to Heatwave
Due to the extreme heat currently affecting Bulgaria, the country’s road authorities have decided to impose temporary traffic restrictions for trucks...
Bratislava closes the D1 to truck transit over 7.5 t – permanent restriction in force
A permanent traffic restriction has been introduced on the D1 motorway in Bratislava for heavy goods vehicles over 7.5 tonnes. The ban applies to transit...