Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertDezember 22, 20250 comments

Hamburg: 55-hour closure of the A7 and the Elbtunnel

Hamburg is preparing for major traffic disruptions. On the first weekend of December 2025, the A7 motorway, together with the key Elbtunnel, will be completely closed for 55 hours.

The full closure will apply in both directions on the section between Hamburg-Heimfeld and Hamburg-Stellingen – from Friday, 5 December at 22:00 until Monday, 8 December at 05:00. Detours have been prepared for the duration of the closure, but authorities warn of significant disruptions and extended travel times.

Recommended detours for transit (freight) traffic:
➡️ Northbound (A7 → Flensburg):
Exit onto the A1 (Horster Dreieck) towards Lübeck
At the Bargteheide junction, switch to the A21 towards Kiel
Continue via the B205 to the Neumünster-Süd junction
Rejoin the A7

➡️ Southbound (A7 → Hanover):
Mirror route:
Neumünster-Süd exit → B205 → Wahlstedt → A21 → Bargteheide → A1 → Horster Dreieck → A7

Detour Map

Delays should also be expected on the detour routes. The tunnel closure is necessary due to the installation of new overhead traffic signs and the implementation of traffic control software. These works are part of a large-scale A7 modernisation project, which includes expanding the motorway to eight lanes and connecting it with the A26.
The A7 is Germany’s most important north–south corridor and one of the busiest motorway sections in the country – in some places carrying more than 130,000 vehicles per day.

Christmas Eve Becomes a Public Holiday, but Without Truck Driving Bans. Ministry ConfirmsPrev
Daily New Restrictions. List of Roads Closed to Heavy Trucks in HungaryNext

Latest Posts

by

First Border Crossings Unblocked. Situation in the Balkans is Changing

After several days of truckers’ protests in the Balkans, the first signs of improvement have emerged. In North Macedonia, border crossings for freight...

First Border Crossings Unblocked. Situation in the Balkans is Changing

Unkategorisiert, Unkategorisiert, UnkategorisiertMärz 21, 2026
by

Düsseldorf: Theodor-Heuss Bridge closed to heavy vehicles from February 1

From today (February 1, 2026), a full traffic ban applies on the Theodor-Heuss Bridge in Düsseldorf for vehicles with a gross vehicle weight exceeding 3.5...

Düsseldorf: Theodor-Heuss Bridge closed to heavy vehicles from February 1

Unkategorisiert, Unkategorisiert, UnkategorisiertMärz 21, 2026
by

Bonn-Nord Bridge closed to heavy goods vehicles from 9 February

From 9 February 2026, hauliers travelling through Bonn will have to take into account significant changes to traffic organisation. The Bonn-Nord Bridge on...

Bonn-Nord Bridge closed to heavy goods vehicles from 9 February

Unkategorisiert, Unkategorisiert, UnkategorisiertMärz 21, 2026

Leave a Reply Antwort abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten

We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.Ok