Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertJanuar 18, 20260 comments

Giurgiu-Ruse Bridge Open for the Holidays. Passage Also Available for Trucks

During the Christmas and New Year period, repair works on the Giurgiu-Ruse border bridge will be suspended, allowing unrestricted passage in both directions – including for trucks.

The Giurgiu-Ruse Bridge, connecting Romania and Bulgaria over the Danube, will be temporarily open to all categories of vehicles from 18 December 2025 to 8 January 2026. During this time, all ongoing construction works will be fully suspended.

Renovation of the crossing began in the summer of 2024 and has caused periodic traffic restrictions since then. The planned technological break at the turn of 2025/2026 means a complete halt of the works, ensuring that for three weeks covering the Christmas and New Year period, the Giurgiu-Ruse border bridge will be fully passable, including for trucks. The crossing is one of the key trade corridors between Romania and Bulgaria and an important transit point along the north-south axis in Southeastern Europe.

According to announcements, repair works will resume on 8 January 2026. This time, the works will involve the roadway on the side leading towards Bulgaria, which may again result in traffic disruptions.

Italy Prepares Changes to Truck Driving Bans - New Schedule for 2026Prev
Winter Restrictions for Diversion Traffic in TyrolNext

Latest Posts

by

First Border Crossings Unblocked. Situation in the Balkans is Changing

After several days of truckers’ protests in the Balkans, the first signs of improvement have emerged. In North Macedonia, border crossings for freight...

First Border Crossings Unblocked. Situation in the Balkans is Changing

Unkategorisiert, Unkategorisiert, UnkategorisiertMärz 21, 2026
by

Düsseldorf: Theodor-Heuss Bridge closed to heavy vehicles from February 1

From today (February 1, 2026), a full traffic ban applies on the Theodor-Heuss Bridge in Düsseldorf for vehicles with a gross vehicle weight exceeding 3.5...

Düsseldorf: Theodor-Heuss Bridge closed to heavy vehicles from February 1

Unkategorisiert, Unkategorisiert, UnkategorisiertMärz 21, 2026
by

Bonn-Nord Bridge closed to heavy goods vehicles from 9 February

From 9 February 2026, hauliers travelling through Bonn will have to take into account significant changes to traffic organisation. The Bonn-Nord Bridge on...

Bonn-Nord Bridge closed to heavy goods vehicles from 9 February

Unkategorisiert, Unkategorisiert, UnkategorisiertMärz 21, 2026

Leave a Reply Antwort abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten