Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertApril 25, 20220 comments

Germany: Weekend closure of A43 near Herne

Deutsche Bahn is rebuilding its bridge over the A43 south of the Herne junction. This will require multiple full closures of the Westphalia autobahn in the coming months.

– During the weekend from 9 p.m. on Friday (April 1) to 5 a.m on Monday (April 4) girders for the new bridge will be laid. During this time, the A43 will be completely closed in the direction of Münster between Herne-Eickel and the Recklinghausen junction. The closure will also affect the roads connecting to the A42 in both directions at Kreuz Herne, i.e. the parallel lane starting from Herne-Eickel. Diversions for trasit traffic lead via the A40 and the A45.

– Cranger Strasse above the motorway also needs to be completely closed during this time. Depending on the direction of travel, inner-city diversions lead along Forellstrasse, Westring, Rottbruchstrasse, Holsterhauser Strasse or Dorstener Strasse.
Work on the bridge will continue in the following weeks and months:

– On Saturday (30 April) the new superstructure above the exit will be concreted. For this reason, the A43 in the direction of Münster will be closed from 4 a.m. to 8 p.m., as will the connections to the A42.

– On the weekend from Friday (1 July) from 9 p.m. to Monday (4 July) at 5 a.m. the shoring will be dismantled. Here, too, the lane towards Münster and the connections will be completely closed.

– At the weekend, from 9 p.m. on Friday (23 September) to 5 a.m on Monday (26 September), traffic in both directions on the A43 between the Herne and Herne-Eickel junctions will be completely closed, as will the connections to the junction. If one of the work stages cannot be carried out as scheduled, the work will be postponed and an alternative date in October will be set.

– The final work will take place in February 2023. On the weekend from 9 p.m on Friday (February 10) to Monday (13 February), the motorway will be closed again in both directions, including the connections in order to demolish the remains of the old bridge.

Deutschland: Wochenend-Vollsperrung bei Herne für Neubau einer Bahnbrücke über die A43Prev
Ausnahmen von den Bestimmungen der Verordnung 561/2006Next

Latest Posts

by

Temporary Truck Traffic Ban on DN39 in Romania

The National Union of Road Hauliers from Romania (UNTRR) informs about the introduction of temporary restrictions on truck traffic on national road DN39 in...

Temporary Truck Traffic Ban on DN39 in Romania

Unkategorisiert, Unkategorisiert, UnkategorisiertAugust 21, 2025
by

Germany: A7 Closure at Horster Dreieck. Major Disruptions on the North–South Route

As of July 10, the A7 motorway has been completely closed in the northbound direction (towards Hamburg) at the Horster Dreieck interchange. The reason? A...

Germany: A7 Closure at Horster Dreieck. Major Disruptions on the North–South Route

Unkategorisiert, Unkategorisiert, UnkategorisiertAugust 21, 2025
by

A4 Closed for the Weekend – Germany Installs Weigh-in-Motion System

From July 18 to 21, 2025, drivers will face major disruptions on the German A4 motorway in the direction of Cologne. The section between the Langerwehe and...

A4 Closed for the Weekend – Germany Installs Weigh-in-Motion System

Unkategorisiert, Unkategorisiert, UnkategorisiertAugust 21, 2025

Leave a Reply Antworten abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten