Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertApril 25, 20220 comments

Germany: Weekend closure of A43 near Herne

Deutsche Bahn is rebuilding its bridge over the A43 south of the Herne junction. This will require multiple full closures of the Westphalia autobahn in the coming months.

– During the weekend from 9 p.m. on Friday (April 1) to 5 a.m on Monday (April 4) girders for the new bridge will be laid. During this time, the A43 will be completely closed in the direction of Münster between Herne-Eickel and the Recklinghausen junction. The closure will also affect the roads connecting to the A42 in both directions at Kreuz Herne, i.e. the parallel lane starting from Herne-Eickel. Diversions for trasit traffic lead via the A40 and the A45.

– Cranger Strasse above the motorway also needs to be completely closed during this time. Depending on the direction of travel, inner-city diversions lead along Forellstrasse, Westring, Rottbruchstrasse, Holsterhauser Strasse or Dorstener Strasse.
Work on the bridge will continue in the following weeks and months:

– On Saturday (30 April) the new superstructure above the exit will be concreted. For this reason, the A43 in the direction of Münster will be closed from 4 a.m. to 8 p.m., as will the connections to the A42.

– On the weekend from Friday (1 July) from 9 p.m. to Monday (4 July) at 5 a.m. the shoring will be dismantled. Here, too, the lane towards Münster and the connections will be completely closed.

– At the weekend, from 9 p.m. on Friday (23 September) to 5 a.m on Monday (26 September), traffic in both directions on the A43 between the Herne and Herne-Eickel junctions will be completely closed, as will the connections to the junction. If one of the work stages cannot be carried out as scheduled, the work will be postponed and an alternative date in October will be set.

– The final work will take place in February 2023. On the weekend from 9 p.m on Friday (February 10) to Monday (13 February), the motorway will be closed again in both directions, including the connections in order to demolish the remains of the old bridge.

Deutschland: Wochenend-Vollsperrung bei Herne für Neubau einer Bahnbrücke über die A43Prev
Ausnahmen von den Bestimmungen der Verordnung 561/2006Next

Latest Posts

by

Night works in the Beneluxtunnel. A4 completely closed on 8-9 December

During the night of 8–9 December 2025, drivers will face major disruptions on the A4 route in the Rotterdam area. Rijkswaterstaat has announced a complete...

Night works in the Beneluxtunnel. A4 completely closed on 8-9 December

UnkategorisiertJanuar 7, 2026
by

Emergency Closure of the Branisko Tunnel in Slovakia

The Polícia SR – Prešovský kraj has announced an emergency closure of the Branisko Tunnel on the D1 motorway in the Prešov region.The restrictions apply to...

Emergency Closure of the Branisko Tunnel in Slovakia

Unkategorisiert, UnkategorisiertDezember 22, 2025
by

Disruptions on Key Transit Route – D1 in Slovakia Temporarily Closed

During the last November weekend, from Saturday, 29 November at 10:00 until Sunday, 30 November in the afternoon, a temporary closure of the D1 motorway...

Disruptions on Key Transit Route – D1 in Slovakia Temporarily Closed

Unkategorisiert, UnkategorisiertDezember 22, 2025

Leave a Reply Antwort abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten