Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertApril 10, 20250 comments

Germany: Traffic restrictions on the Norderelbe Bridge on the A1

As part of the expansion of the A1, work has begun on the new Norderelbe Bridge, which is to connect Hamburg-Wilhelmsburg with Rothenburgsort. Its construction is scheduled to be completed in 2029-2030, but in the meantime it is necessary to ensure the safety and stability of the existing bridge. For this reason, the Norderelbe Bridge will be completely closed for several days from 14 March.

Traffic restrictions on the Norderelbe Bridge

To relieve the most important elements of the bridge, including the supports and lanes, traffic organization will be changes as follows:
➡️ Existing road markings will be moved to the left in order to relieve the outermost lane, the service path and the barriers;
➡️ a 60 km/h speed limit, especially for trucks, will be imposed in order to protect the bridge structure;
➡️ an overtaking ban for trucks and an obligation to maintain a distance of 50 meters between vehicles, even in the event of traffic jams.
➡️ speed and distance will be constantly monitored.

Despite these restrictions, vehicles transporting abnormal loads can still pass across the bridge provided such journeys have been previously registrated and approved.

Changes in traffic organization on the A1 in Hamburg

Additional measures have been introduced to ensure the smooth flow of HGV traffic, including:
➡️ an overtaking ban on the A1 will be extended from the HH-Harburg junction (38) to the HH-Moorfleet junction (34) beyond the Norderelbe bridge,
➡️ The road connecting A255 RiFa Süd with the A1 RiFa Lübeck at the Norderelbe triangle will be closed to vehicles with a GVW over 7.5 tonnes which will be diverted via the HH-Harburg junction (38).

The bridge will be completely closed in both directions over the weekend:

➡️ from 10:00 p.m. on Friday, March 14, to 5:00 a.m. on Monday, March 17,

Diversions:
➡️ Southbound traffic: from the HH-Billstedt junction (33) via the B5, B75 and A255 to the A1 (diversion U26).
➡️ northbound traffic: from the Norderelbe junction (36) via the A255, B75 and B5 to the HH-Billstedt junction (33) (diversion U85).
➡️ Diversions for drivers heading towards the B75: via the A255, B75 and B5 to the HH-Billstedt junction (33).
➡️ For drivers heading for Bremen: Exit at the HH-Südost junction (1), towards Lübeck and then diversion via the HH-Billstedt junction (33).

Further work and closures in 2025

More closures and maintenance works are planned on the Norderelbe bridge in the future, including:
➡️ 25-28 April: closure of RiFa-Nord to replace temporary structures.
➡️ 9-12 May: asphalt renovation on the Norderelbe Bridge.
➡️ 23-26 May: closure of RiFa Süd, replacement of temporary structures.

The progress of work on the Norderelbe Bridge largely depends on the weather. If the work cannot be completed in March, an alternative weekend will be scheduled. In this case, the work will be carried out from 10 p.m. on April 11 to 5 a.m. on April 14.

Belgium: disruptions in the Liefkenshoek and Bevrijdings tunnelsPrev
A nighttime closure of the A12 in both directions – a diversion via InnsbruckNext

Latest Posts

by

Switzerland to Close A4 in Schaffhausen – Trucks to Be Stranded Due to German Public Holiday

In connection with the upcoming Feast of Corpus Christi, which will be observed in Germany on June 19, 2025, the Swiss authorities are preparing for a...

Switzerland to Close A4 in Schaffhausen – Trucks to Be Stranded Due to German Public Holiday

Unkategorisiert, UnkategorisiertJuli 6, 2025
by

Bulgaria Introduces Temporary Truck Bans Due to Heatwave

Due to the extreme heat currently affecting Bulgaria, the country’s road authorities have decided to impose temporary traffic restrictions for trucks...

Bulgaria Introduces Temporary Truck Bans Due to Heatwave

Unkategorisiert, UnkategorisiertJuli 6, 2025
by

Bratislava closes the D1 to truck transit over 7.5 t – permanent restriction in force

A permanent traffic restriction has been introduced on the D1 motorway in Bratislava for heavy goods vehicles over 7.5 tonnes. The ban applies to transit...

Bratislava closes the D1 to truck transit over 7.5 t – permanent restriction in force

UnkategorisiertJuli 6, 2025

Leave a Reply Antworten abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten