Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertSeptember 7, 20240 comments

Germany: complete closure of the A43 – diversion for through traffic

The closure is connected with the construction of a tunnel near the Herne intersection.

The A43 motorway will be completely closed from 9 PM on Friday, July 26, to 5:00 AM on Monday, July 29, in both directions between Bochum-Riemke and the Recklinghausen junction – with one exception: the Recklinghausen-Hochlarmark junction towards Münster remains open.

Through traffic will be diverted via the A40, A45 and A42 or A2. During the closure, the motorway surface at the Herne junction will also be replaced. The closure will also be used to set up a new diversion route, which will be in use for a period of two weeks owing to the detection of what is believed to be a bomb between Bochum-Riemke and Herne-Eickel.

Romania and Bulgaria introduce a sudden HGV driving ban owing to a heat wavePrev
Austria: exits on the A10 motorway blocked to prevent drivers from avoiding traffic jamsNext

Latest Posts

by

France: Night-time closure of the A40 motorway

Drivers travelling on the A40 in France will face major disruptions during the night of 24–25 November. The section between the Bonneville Zones...

France: Night-time closure of the A40 motorway

Unkategorisiert, UnkategorisiertDezember 16, 2025
by

Tyrol: As Many as 30 Days of Truck Traffic Dosage on the A12 and A13

The Tyrolean authorities have published the official traffic dosage calendar (LKW-Dosierung), which provides for as many as 30 days of controlled truck...

Tyrol: As Many as 30 Days of Truck Traffic Dosage on the A12 and A13

Unkategorisiert, UnkategorisiertDezember 16, 2025
by

Trucks Over 20 Tonnes Banned from Parts of the Road Network in Hungary

Hungarian transport organisations are sounding the alarm over the escalating problem of introducing local restrictions for trucks over 20 tonnes without any...

Trucks Over 20 Tonnes Banned from Parts of the Road Network in Hungary

UnkategorisiertDezember 16, 2025

Leave a Reply Antwort abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten