Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertAugust 21, 20250 comments

Germany: A7 Closure at Horster Dreieck. Major Disruptions on the North–South Route

As of July 10, the A7 motorway has been completely closed in the northbound direction (towards Hamburg) at the Horster Dreieck interchange. The reason? A sudden closure was implemented south of Hamburg, in the direction of Flensburg, after severe structural damage was discovered in a concrete bridge during renovation work near the Horster Dreieck.

The motorway operator decided to completely suspend traffic on this section heading north for safety reasons. There is currently no official information on how long the disruption will last—a detailed technical assessment is underway to determine the extent of the damage and necessary repair measures.

Drivers heading toward Flensburg must use a detour via the parallel A1 motorway. The recommended route leads from Horster Dreieck via signs to the A39 (Lüneburg/Seevetal-Maschen), through the Maschener Kreuz interchange, and back to the A7. Southbound traffic is currently unaffected and flowing normally.

The A7 is one of Germany’s key transport arteries—it connects the southern part of the country with Denmark and handles a massive volume of transit traffic, including international freight. Its partial closure poses a significant challenge for transport companies, especially in the middle of the holiday season, when traffic volumes are even higher. Industry associations are urging transport firms and drivers to closely monitor traffic updates, plan routes flexibly, and account for potential delays in their delivery schedules.

MAPA

A4 Closed for the Weekend – Germany Installs Weigh-in-Motion SystemPrev
Temporary Truck Traffic Ban on DN39 in RomaniaNext

Latest Posts

by

First Border Crossings Unblocked. Situation in the Balkans is Changing

After several days of truckers’ protests in the Balkans, the first signs of improvement have emerged. In North Macedonia, border crossings for freight...

First Border Crossings Unblocked. Situation in the Balkans is Changing

Unkategorisiert, Unkategorisiert, UnkategorisiertMärz 21, 2026
by

Düsseldorf: Theodor-Heuss Bridge closed to heavy vehicles from February 1

From today (February 1, 2026), a full traffic ban applies on the Theodor-Heuss Bridge in Düsseldorf for vehicles with a gross vehicle weight exceeding 3.5...

Düsseldorf: Theodor-Heuss Bridge closed to heavy vehicles from February 1

Unkategorisiert, Unkategorisiert, UnkategorisiertMärz 21, 2026
by

Bonn-Nord Bridge closed to heavy goods vehicles from 9 February

From 9 February 2026, hauliers travelling through Bonn will have to take into account significant changes to traffic organisation. The Bonn-Nord Bridge on...

Bonn-Nord Bridge closed to heavy goods vehicles from 9 February

Unkategorisiert, Unkategorisiert, UnkategorisiertMärz 21, 2026

Leave a Reply Antwort abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten