
Germany: A46 in Düsseldorf completely closed from Friday
The A46 motorway will be completely closed in both directions from August 15, 2025 at 9:00 p.m. until August 18, 2025 at 5:00 a.m.
Due to a scheduled inspection of the load-bearing cables, the Fleher Bridge (a bridge over the Rhine separating Düsseldorf and Neuss) will be entirely closed between the Düsseldorf-Bilk and Neuss-Uedesheim interchanges. A wide detour route has been set up via the Leverkusen and Cologne-North (Köln-Nord) interchanges. The works were originally scheduled for August 1–4 but had to be postponed due to weather conditions. The detours are signposted.
Vollsperrung, A 46, beide Fahrtrichtungen, vom 15.08.2025, 21:00 Uhr bis 18.08.2025, 05:00 Uhr
Für die regelmäßige…
Latest Posts
Night works in the Beneluxtunnel. A4 completely closed on 8-9 December
During the night of 8–9 December 2025, drivers will face major disruptions on the A4 route in the Rotterdam area. Rijkswaterstaat has announced a complete...
Emergency Closure of the Branisko Tunnel in Slovakia
The Polícia SR – Prešovský kraj has announced an emergency closure of the Branisko Tunnel on the D1 motorway in the Prešov region.The restrictions apply to...
Disruptions on Key Transit Route – D1 in Slovakia Temporarily Closed
During the last November weekend, from Saturday, 29 November at 10:00 until Sunday, 30 November in the afternoon, a temporary closure of the D1 motorway...