Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertJuli 25, 20250 comments

France – Closure of the A6 and A126 Motorways

As part of its annual infrastructure maintenance program, the Île-de-France Roads Directorate (DiRIF), which manages the national road network in the Paris region, will carry out pavement renovation works on the A6 motorway, between Wissous and Évry-Lisses, and on the A126 motorway, between the municipalities of Champlan and Chilly-Mazarin in the Essonne department.

Due to these planned works, the A6 motorway (Paris to province direction) and the outer carriageway of the A126 will be closed along a 9 km section from Tuesday, July 15 at 11:00 a.m. until Friday, August 1 at 1:00 p.m., excluding weekends.

To minimize disruption for road users, the closures will only be in effect on weekdays.

To further reduce traffic disruption, diversion routes will be set up in both directions and clearly marked with special signage. Due to the risk of congestion, drivers are advised to avoid the area if possible during the works.

➡️ Detour from A6a/A6b toward Évry-Courcouronnes / Lyon:
Take the A10 toward Les Ulis, then continue along the N104 (outer ring road) to Évry-Courcouronnes, from where you can rejoin the A6.

➡️ Detour from A10 (province → Paris) toward Évry-Courcouronnes / Lyon:
◾ Continue on the A10 toward Paris,
◾ Exit onto A6b, then onto A86 toward Créteil,
◾ Exit at Rungis, return to the A86 toward Versailles, then take the A6b toward the province,
◾ Rejoin the main route via A10 and N104 (outer ring road).

Another phase of the project is scheduled for the autumn, this time in the province to Paris direction. The works will take place from October 20 to November 2, 2025, including weekends.

Hungary: Nighttime truck ban lifted due to heatwavePrev
Bulgaria Introduces New Weight Restrictions on the Petrohan PassNext

Latest Posts

by

First Border Crossings Unblocked. Situation in the Balkans is Changing

After several days of truckers’ protests in the Balkans, the first signs of improvement have emerged. In North Macedonia, border crossings for freight...

First Border Crossings Unblocked. Situation in the Balkans is Changing

Unkategorisiert, Unkategorisiert, UnkategorisiertMärz 21, 2026
by

Düsseldorf: Theodor-Heuss Bridge closed to heavy vehicles from February 1

From today (February 1, 2026), a full traffic ban applies on the Theodor-Heuss Bridge in Düsseldorf for vehicles with a gross vehicle weight exceeding 3.5...

Düsseldorf: Theodor-Heuss Bridge closed to heavy vehicles from February 1

Unkategorisiert, Unkategorisiert, UnkategorisiertMärz 21, 2026
by

Bonn-Nord Bridge closed to heavy goods vehicles from 9 February

From 9 February 2026, hauliers travelling through Bonn will have to take into account significant changes to traffic organisation. The Bonn-Nord Bridge on...

Bonn-Nord Bridge closed to heavy goods vehicles from 9 February

Unkategorisiert, Unkategorisiert, UnkategorisiertMärz 21, 2026

Leave a Reply Antwort abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten