Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertMai 3, 20250 comments

Disaster on Norway’s E6: Detour Extends Route by Over 300 km

A major rockslide has completely blocked both directions of the E6 highway in Rosten (Gudbrandsdalen region), one of Norway’s most vital transport arteries. The incident has brought transit traffic to a standstill, forcing carriers to take lengthy detours, leading to increased costs and operational challenges.

The landslide occurred overnight between March 30 and 31. A massive rockfall, plummeting from a height of approximately 50 meters, swept down boulders, trees, and soil, completely obstructing the roadway. The E6 serves as a key north-south transport corridor, connecting the regions of Trøndelag, Møre og Romsdal, and Oslo with southern Norway and Sweden. Geologists from the Norwegian Public Roads Administration (Statens vegvesen) are currently assessing the site, but there is no clear timeline for reopening the road. Officials warn that clearing the debris and securing the slope could take considerable time.

The Norwegian Road Transport Association (NLF) responded immediately to the crisis. NLF regional director Guttorm Tysnes has urged authorities to temporarily allow modular truck combinations on county roads 27 (via Venabygdsfjellet) and 29 (Folldal–Hjerkinn). He emphasizes that these routes are already accessible to heavy vehicle combinations up to 24 meters in length and 60 tons in weight, which would enable standard modular transport units (TSL) to pass.

For carriers who regularly rely on the E136, the detour through Østerdalen adds as much as 340 kilometers to their round-trip journey. This makes it significantly more difficult to comply with drivers’ working hours and results in substantial additional costs says Tysnes.

Østerdalen Detour – The Only Alternative

Norwegian road authorities have identified national road 3 (Rv. 3) in Østerdalen as the only viable detour:

➡️ From the south: E6 Kolomoen – Rv. 3 Elverum – Rv. 3 Østerdalen – E6 Ulsberg
➡️ From the north: E6 Ulsberg – Rv. 3 Østerdalen – E6 Kolomoen
➡️ From the west: E6 Dombås – E6 Ulsberg – Rv. 3 Elverum – E6 Kolomoen

Drivers and transport operators are urged to plan their routes ahead of time and stay updated with announcements from Norwegian road authorities.

A complete closure of the bridge on the border between Romania and BulgariaPrev
Hungary: renovation of the M1Next

Latest Posts

by

Abolition of the 25-Hour Parking Limit at State-Owned Motorway Parking Areas in Denmark

Since 2018, Denmark has enforced a time limit on truck parking at state-owned motorway rest areas — a maximum of 25 hours. As of January 1, 2026, this...

Abolition of the 25-Hour Parking Limit at State-Owned Motorway Parking Areas in Denmark

UnkategorisiertAugust 14, 2025
by

Catalonia – Reinstatement of Permanent Truck Ban on N-340

The Catalan Traffic Service (SCT) has announced the reinstatement of the permanent traffic ban for heavy goods vehicles over 26 tons on the N-340 road,...

Catalonia – Reinstatement of Permanent Truck Ban on N-340

UnkategorisiertAugust 11, 2025
by

A22 Brennero – Additional Saturday Traffic Ban for Trucks from July 5 to August 30

From July 5 to August 30, 2025, an additional traffic ban for heavy goods vehicles with a gross vehicle weight (GVW) over 7.5 tons will be in effect on the...

A22 Brennero – Additional Saturday Traffic Ban for Trucks from July 5 to August 30

UnkategorisiertAugust 1, 2025

Leave a Reply Antworten abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten