Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertJuli 17, 20240 comments

Closures of the Gotthard Tunnel on the A2 in June

The Gotthard road tunnel in Switzerland has to be completely closed during several nights in June for cleaning and maintenance works.

⏩ June 17 – 21 (4 nights) every night from 8 p.m. to 5 a.m.
⏩ June 24 – 28 (4 nights) every night from 8 p.m. to 5 a.m.

Car traffic will be diverted through the Gotthard Pass, while HVG traffic (>3.5 tons) will be stopped half an hour before the scheduled closure.

Belarus introduces tonnage restrictions owing to summer heat wavesPrev
Major traffic disruptions in several places in Belgium owing to closed roads and tunnelsNext

Latest Posts

by

Hungary: Truck traffic ban suspended overnight from July 26 to 27 due to heatwave

The Hungarian Ministry of Construction and Transport, at the request of the national hauliers' association MKFE, has temporarily relaxed the weekend truck...

Hungary: Truck traffic ban suspended overnight from July 26 to 27 due to heatwave

Unkategorisiert, Unkategorisiert, UnkategorisiertSeptember 7, 2025
by

Hungary lifts night truck traffic ban on August 9–10 due to heatwave

Due to a heatwave, the night truck traffic ban for vehicles over 7.5 tonnes GVW will be temporarily lifted in Hungary from Saturday to Sunday night (9–10...

Hungary lifts night truck traffic ban on August 9–10 due to heatwave

Unkategorisiert, Unkategorisiert, UnkategorisiertSeptember 7, 2025
by

11 – 14 August: Night-time traffic interruptions in the Fréjus Tunnel

The Fréjus Tunnel operator has announced planned short-term closures of the facility from 11 to 14 August 2025.Since the opening of the tunnel’s second...

11 – 14 August: Night-time traffic interruptions in the Fréjus Tunnel

Unkategorisiert, Unkategorisiert, UnkategorisiertSeptember 7, 2025

Leave a Reply Antworten abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten