Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertJuli 2, 20250 comments

Berlin: New Regulations on A100. Drivers Face €500 Fine and License Suspension.

Starting from May 15, 2025, new traffic restrictions apply on the A100 motorway near the Funkturm interchange in Berlin. These changes are the result of infrastructure issues caused by the closure of the Ringbahnbrücke and Westendbrücke bridges.

The restrictions follow the complete closure of the Ringbahn Bridge on March 19 this year. Since March 24, traffic heading towards Hamburg has been limited to a single lane in an emergency configuration. As a result, the ramp connecting the A115 to the A100 towards Hamburg has also been completely closed. The new traffic management system aims to reduce congestion and improve flow on one of the key sections of the German motorway network.

Northbound traffic will be directed through the Rathenauplatz tunnel using three lanes, but with significant restrictions:
❌ The left lane is exclusively for vehicles with a gross vehicle weight (GVW) of up to 3.5 tonnes heading towards the A100 in the direction of Hamburg.
❌ The middle lane leads to the A115 towards Leipzig.
❌ The right lane directs vehicles to the Messedamm junction, and only vehicles over 3.5 tonnes planning to continue towards Hamburg are permitted to use this lane.

WARNING: Trucks over 3.5 tonnes that do not comply with the new regulations may face a fine of €500 and a two-month driving ban.

Additionally, the entrance from the AVUS Nordkurve parking area to the A115 has been closed.

Austria: Truck traffic ban on Brenner Pass towards Italy on May 28Prev
Hungary eases truck driving ban for Pentecost – night-time transit allowedNext

Latest Posts

by

First Border Crossings Unblocked. Situation in the Balkans is Changing

After several days of truckers’ protests in the Balkans, the first signs of improvement have emerged. In North Macedonia, border crossings for freight...

First Border Crossings Unblocked. Situation in the Balkans is Changing

Unkategorisiert, Unkategorisiert, UnkategorisiertMärz 21, 2026
by

Düsseldorf: Theodor-Heuss Bridge closed to heavy vehicles from February 1

From today (February 1, 2026), a full traffic ban applies on the Theodor-Heuss Bridge in Düsseldorf for vehicles with a gross vehicle weight exceeding 3.5...

Düsseldorf: Theodor-Heuss Bridge closed to heavy vehicles from February 1

Unkategorisiert, Unkategorisiert, UnkategorisiertMärz 21, 2026
by

Bonn-Nord Bridge closed to heavy goods vehicles from 9 February

From 9 February 2026, hauliers travelling through Bonn will have to take into account significant changes to traffic organisation. The Bonn-Nord Bridge on...

Bonn-Nord Bridge closed to heavy goods vehicles from 9 February

Unkategorisiert, Unkategorisiert, UnkategorisiertMärz 21, 2026

Leave a Reply Antwort abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten