Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertJuli 5, 20240 comments

Altona Tunnel: 55-hour closure of the A7

Work on the expansion of the eight-lane A7 motorway and the construction of a new noise protection tunnel on the Altona section is underway. The next step will involve removing the last structural component of the viaduct, which means the motorway has to be closed.

According to information provided by Autobahn GmbH, the A7 motorway will be completely closed from 20:00 PM on Friday, June 7, until 5:00 AM on Monday, June 10.
❌ southbound carriageway, between the intersections HH-Stellingen (26) and HH-Heimfeld (32),
❌ northbound carriageway, between the junctions HH-Heimfeld (32) and HH-Volkspark (27).

Diversion routes:

During the closures through and local traffic in both directions will be diverted along the A1, A21 and B205 motorways, and information for drivers will be displayed on VMS panels.
❌ traffic from the south from the Buchholzer triangle (43) / Horster triangle (40), through Maschener Kreuz (39), then along the A1 motorway.
❌ Drivers are advised to avoid Hamburg. Traffic from the from the north, should follow along the B205 from the Neumünster-Süd junction (15).

Serious disruptions in French portsPrev
Exemption from driving bans in BavariaNext

Latest Posts

by

Traffic Disruptions in Hungary Due to the Tour de Hongrie – List of Road Closures and Detours

The Tour de Hongrie 2025 kicks off on May 13, and drivers across Hungary – including in Budapest – should expect temporary road closures and detours due to...

Traffic Disruptions in Hungary Due to the Tour de Hongrie – List of Road Closures and Detours

UnkategorisiertJuni 28, 2025
by

Germany Tightens Border Controls – Drivers Should Expect Delays

The new German federal government, following the announcements of Interior Minister Alexander Dobrindt, is introducing even stricter controls at national...

Germany Tightens Border Controls – Drivers Should Expect Delays

UnkategorisiertJuni 28, 2025
by

Closed Access to A2 towards Świecko. Detours via DK92 from May 17

Starting May 17, the first phase of pavement renovation will begin at the Poznań Wschód motorway interchange, where the A2 motorway intersects with the S5...

Closed Access to A2 towards Świecko. Detours via DK92 from May 17

UnkategorisiertJuni 26, 2025

Leave a Reply Antworten abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten