Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)

Avice Group

  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
  • Startseite
  • Appoinment test GE
  • Arbeit
  • Kontakte
  • Nachricht
  • Über die Firma
  • Deutsch
    • English (Englisch)
    • Polski (Polnisch)
    • Русский (Russisch)
by
UnkategorisiertJuli 5, 20240 comments

Altona Tunnel: 55-hour closure of the A7

Work on the expansion of the eight-lane A7 motorway and the construction of a new noise protection tunnel on the Altona section is underway. The next step will involve removing the last structural component of the viaduct, which means the motorway has to be closed.

According to information provided by Autobahn GmbH, the A7 motorway will be completely closed from 20:00 PM on Friday, June 7, until 5:00 AM on Monday, June 10.
❌ southbound carriageway, between the intersections HH-Stellingen (26) and HH-Heimfeld (32),
❌ northbound carriageway, between the junctions HH-Heimfeld (32) and HH-Volkspark (27).

Diversion routes:

During the closures through and local traffic in both directions will be diverted along the A1, A21 and B205 motorways, and information for drivers will be displayed on VMS panels.
❌ traffic from the south from the Buchholzer triangle (43) / Horster triangle (40), through Maschener Kreuz (39), then along the A1 motorway.
❌ Drivers are advised to avoid Hamburg. Traffic from the from the north, should follow along the B205 from the Neumünster-Süd junction (15).

Serious disruptions in French portsPrev
Exemption from driving bans in BavariaNext

Latest Posts

by

Slovakia: New Penalties for Drivers and Fewer Restrictions for Trucks During Holidays

The Government of Slovakia approved on November 5 a draft comprehensive amendment to the Road Traffic Act. The changes are set to take effect on May 1,...

Slovakia: New Penalties for Drivers and Fewer Restrictions for Trucks During Holidays

Unkategorisiert, UnkategorisiertDezember 4, 2025
by

Hamburg: Köhlbrand Bridge closed. Detours for trucks over the weekend

One of Hamburg’s main port connections will be completely closed this coming weekend. The Köhlbrand Bridge will be inaccessible from Friday, November 14 at...

Hamburg: Köhlbrand Bridge closed. Detours for trucks over the weekend

Unkategorisiert, UnkategorisiertDezember 4, 2025
by

Netherlands closes A7: detours for trucks, delays up to 90 minutes

On the night from Tuesday, November 18 to Wednesday, November 19, between 11:00 p.m. and 5:00 a.m., the A7 motorway (section at the Afsluitdijk entrance) in...

Netherlands closes A7: detours for trucks, delays up to 90 minutes

UnkategorisiertDezember 4, 2025

Leave a Reply Antwort abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

Avice Group

Wir sind ein internationales Unternehmen Avice Group. 365 Tage im Jahr sind wir im Güterverkehr tätig. Die Lieferung von Gütern auch in die entlegensten Ecken Europas.

Appricotsoft.com Development

Hauptverwaltung

Polen

30-415 Krakau ul. Bonarka 21, PL 

Email: [email protected]  

Kontakte erhalten